Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Costs <br /> <br />The water system can be structured a number of ways depending on decisions <br /> <br /> <br />as to which water supply alternative will be selected and the extent of the <br /> <br /> <br />area to be served. Those decisions will have an effect on the final project <br /> <br /> <br />cost. <br /> <br /> <br />As proposed, the water system requires the following construction: <br /> <br /> <br />1. Develop a deep well in the location shown on Map 1. <br /> <br /> <br />2. Construct a 60,000 gallon storage at an elevation of 6,970 feet. <br />3. Install water mains along Fox FaI1ll Road. <br />4. Construct the distribution piping shown on Map 2. <br />The estimated construction cost for the proposed system, based on current <br />costs, is shown in the following tables, The total project cost consists of <br />the est~~ated construction costs plus allowances for contingencies, inflation, <br /> <br />and engineering, legal and administrative services, An additional cost for <br /> <br />land, first year debt service, and reserve is also included. <br /> <br />Schedule 1 - Water Supply, St orage I Transmission <br />Item Description Qnty Unit Unit Total <br /> Price Price <br />1 TN ell 500' depth 500 VF $50 $25,000 <br /> 6" diam, 7t Hp pump <br />2 Well house, meter,pipe, valves 1 1S $16,000 <br />3 Storage tank 60,000 gal 1 1S $40,000 <br /> ground level, steel <br />4 Transmission pipe, 8" 160 psi 9+00 IF $ 8 $43,200 <br />5 Controls, tank to well 1 1S $ 2,000 <br /> Schedule 1 Total = $126,200 <br /> <br />23 <br />