My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153355 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153355 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2014 3:42:14 PM
Creation date
10/5/2006 11:45:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153355
Contractor Name
Beaver Park Water, Inc.
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 80-67
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IN WITNESS WHEREOF, the parties hereto have executed this Amendment on the day <br /> first above written. <br /> BORRO - :eaver , rk Water, Inc. State of Colorado <br /> Joh, '-•enl• ` " overnor <br /> Jack Tyler, Vice resident By i.1f/` - -.•�(„/ <br /> ( SEAL ) For the Execu ' e Director <br /> Department o Natural Resources <br /> Colorado Water Conservation Board <br /> Attest (Seal) Jennifer L. Gimbel, Director <br /> 'r:-Approv-d m <br /> By , <br /> Joh . Miller, Secretary/Treasurer By <br /> WCB on‘act Manager <br /> ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br /> CRS 24-30-202 requires that the State Controller approve all state contracts. This <br /> contract is not valid and there are no loan funds available until the State Controller, or <br /> such assistant as he may delegate, has signed it <br /> David J. McDermott, CPA, State Controller <br /> By <br /> Date w/G%// <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.