<br />, I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />! I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I I
<br />I
<br />
<br />LEG END
<br />
<br />Woodword-Clyde Consuitants_
<br />
<br />~
<br />td
<br />ra
<br />RJ
<br />t:d
<br />P1
<br />t(J
<br />n
<br />U
<br />~
<br />~
<br />
<br />MAN-PLACED FILL, SAND, GRAVELLY, SLIGHTLY SILTY TO SILTY,
<br />OR GRAVEL, SANDY, SILTY, MOIST, BROWN, RED-BROWN
<br />(SP, SP-SM, SM, GP, GM) (EMBANKMENT)
<br />
<br />SILT, STIFF, SLIGHTLY CLAYEY TO VERY CLAYEY, SLIGHTLY SANDY
<br />TO SANDY, MOIST TO WET, BROWN, DARK BROWN (ML)
<br />
<br />CLAY, STIFF TO VERY STIFF, VERY SILTY, NO SAND TO SANDY, NO
<br />GRAVEL TO GRAVELLY, MOIST, BROWN, RED, TAN, GRAY,
<br />RED-BROWN (CL)
<br />
<br />SAND, MEDIUM DENSE, SILTY, SLIGHTLY CLAYEY; WET, BROWN (SM)
<br />
<br />SAND, LOOSE, CLAYEY, GRAVELLY, MOIST, RED-BROWN, BROWN (SC)
<br />
<br />o
<br />....
<br />
<br />SAND, LOOSE TO MEDIUM DENSE, CLEAN TO SILTY OR INTERLAYED
<br />WITH SANDY SILT LENSES, MOIST TO WET, BROWN, GRAY (SP, SP-SM)
<br />
<br />SAND, LOOSE TO DENSE, CLEAN TO CLAYEY, SLIGHTLY GRAVELLY
<br />TO SANDY GRAVEL, MOIST TO WET, BROWN, RED-BROWN, TAN
<br />(SP, SP-GP)
<br />
<br />GRAVEL, DENSE TO VERY DENSE, CLEAN TO SILTY, SANDY, SLIGHTLY
<br />COBBLY TO COBBLES WITH OCCASIONAL BOULDERS, MOIST TO WET,
<br />BROWN, RED-BROWN, YELLOW-BROWN (GP, GP-GM)
<br />
<br />INDICATES WATER LEVEL AND NUMBER OF DAYS AFTER DRILLING
<br />
<br />14/12 INDICATES THAT 14 BLOWS OF A 140-POUND HAMMER FALLING 30
<br />INCHES WERE REQUIRED TO DRIVE A 2-INCH SAMPLER 12 INCHES
<br />
<br />NOTES:
<br />
<br />1. TEST HOLES 10H THRU 14H WERE DRILLED OCTOBER 23 THRU 25, 1989
<br />WITH 3.25-INCH I.D. HOLLOW STEM AUGERS POWERED BY A CENTRAL MINE
<br />EQUIPMENT (CME-55) DRILL RIG. TEST HOLES 1H THRU 9H WERE DRILLED
<br />AND TEST PITS 1 H THRU 1 2H WERE DUG FOR OUR REPORT NO. 9059-9048,
<br />DATED NOVEMBER 1, 1965.
<br />
<br />2. TEST HOLE LOCATIONS ARE APPROXIMATE AND WERE LOCATED BY SURVEY
<br />BY STEWART AND ASSOCIATES.
<br />
<br />3. TEST HOLE ELEVATIONS WERE SURVEYED BY STEWART AND ASSOCIATES.
<br />
<br />4. TEST HOLE AND TEST PIT LOGS IN THIS REPORT ARE SUBJECT TO THE
<br />LIMITATIONS, EXPLANATIONS AND CONCLUSIONS OF THIS REPORT.
<br />
<br />5. THESE TEST HOLE AND TEST PIT LOGS SUMMARIZE FINDINGS RELIED ON
<br />IN FORMULATING THE DESIGN CRITERIA PRESENTED IN THIS REPORT.
<br />THE EXPLORATIONS WERE NOT MADE TO DEFINE CONDITIONS FOR
<br />CONSTRUCTION NOR IS THE INFORMATION PRESENTED HEREIN FOR
<br />THAT PURPOSE.
<br />
<br />Cl
<br />!oJ
<br />...J
<br />r--
<br />r--
<br />'"
<br />'"
<br />'"
<br />
<br />Job No. :
<br />
<br />22377-9048
<br />
<br />LEGEND AND NOTES
<br />FOR FIGURES 2, 3 AND 4
<br />
<br />Prepared by : T.A.T.
<br />
<br />Dote:
<br />
<br />11/27/89
<br />
<br />HOURGLASS RESERVOIR OAM
<br />
<br />~
<br />~
<br />FiG. 5
<br />
|