Laserfiche WebLink
<br />'. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />il <br /> <br />Woodward.Clyde Consultants <br /> <br />Hourglass Reservoir <br />Feasibility Study <br /> <br /> Summary of Cost Estimates <br />Option Cost Estimate <br />1. Downstream Drainage Construction $500,000 <br />2. Partial Depth Slurry Wall $2,000,000 to $6,000,000 <br />3. Partial Clay Blanket . $3,000,000 <br />4. Partial Synthetic Liner $3.000,000 <br />5. Partial RCC Liner $4,000,000 <br />6. Full Clay Blanket $14.000,000 <br />7. Full Depth Slurry Wall $40,000,000 <br /> <br />Hourglass Reservoir - Project No. 22377-9048 <br />