Laserfiche WebLink
<br />II <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABlE 6.1 <br />PROJECT COST SUMMARY <br /> <br />Feasibility Study . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ <br /> <br />40,000 <br /> <br />Ootion 1 - Downstream Drainaae Construction .............. <br /> <br />328,075 <br /> <br />Engineering (20%) ................................ <br />Contingency (20% C & E) ........................... <br />Project Price Escalation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> <br />65,615 <br />78,738 <br />32.105 <br /> <br />TOTAL OPTION 1 (not including Feasibility Study) ............ $ 504,533 <br /> <br />Ootion 2 - Partial Deoth Slurry Wall - Low Estimate lC . . . . . . . . . $ 924,000 * <br /> <br />Engineering (20%) ................................ <br />Contingency (20% C & E) ........................... <br />Project Price Escalation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> <br />184,800 <br />258,600 <br />154.616 <br /> <br />TOTAL OPTION 2 (not including Feasibility Study) ............ $1,522,050 <br /> <br />. <br /> <br />Original Option 2 - Low Estimate of $1,376,975 reduced assuming prior <br />Option 1 completion. <br /> <br />6.1.1 COST OF FEASIBILITY STUDY <br /> <br />The amount of the contracts between McCall-Ellingson & Morrill, Inc. and the City for <br />initial site investigations and the feasibility study total $40,000. The City Is paying 50 <br />percent of the total amount out of their operating budget. The remaining 50 percent <br />is financed by CWBC at a 5 percent annual interest rate. Interest is not due until <br />completion of the project. <br /> <br />6.1.2 ESTIMATED CONSTRUCTION COST <br /> <br />Construction costs are estimated for 1990 dollar values. These costs are based on <br />work quantities and appropriate unit rates and lump sum items. Costs reflect the high <br />mountain, limited construction season, and other site characteristics. <br /> <br />6-2 <br />