Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Option 1 has the potential for creating 430 acre feet of new, water supply. The stability of the dam will <br />be brought up to current standards, Option 2 has the potential for creating 100 acre-feet of additional <br />water supply on the basis of hold-over storage. <br /> <br />The foregoing construction costs are for construction only, not including contingency, engineering, price <br />escalation and Interest. See Table 6.1 for these costs. <br />