Laserfiche WebLink
<br />", <br /> <br />"\ <br />. <br /> <br />"1 <br />. <br /> <br />~ ' .\ <br /> <br />With the project reduced to a level of activity of 54.73Y. since March <br />2, 1987, we are now only recovering that percentaqe of our allocated <br />overhead. The unrecovered or unabsorbed overhead amounts to this <br />difference from 100Y.. <br /> <br />100.00Y. - 54.73Y. = 45.27Y. unallotted overhead. <br /> <br />Unabsorbed Daily Overhead <br />573.57 x 45.27~ = <br /> <br />259.66 <br /> <br />Total Unabsorbed Overhead <br />March 3, 1989 thru April 22, 1989 <br />259.66 x 51 days = <br /> <br />13,242.66 <br />