My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00233
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153528
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />", <br /> <br />"\ <br />. <br /> <br />"1 <br />. <br /> <br />~ ' .\ <br /> <br />With the project reduced to a level of activity of 54.73Y. since March <br />2, 1987, we are now only recovering that percentaqe of our allocated <br />overhead. The unrecovered or unabsorbed overhead amounts to this <br />difference from 100Y.. <br /> <br />100.00Y. - 54.73Y. = 45.27Y. unallotted overhead. <br /> <br />Unabsorbed Daily Overhead <br />573.57 x 45.27~ = <br /> <br />259.66 <br /> <br />Total Unabsorbed Overhead <br />March 3, 1989 thru April 22, 1989 <br />259.66 x 51 days = <br /> <br />13,242.66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.