Laserfiche WebLink
<br />1-_ t>-"C~2'" fR ~ft~ I <br />~OPB <br /> <br />. <br /> <br />/ I '- r../' I , ..,.,_ <br />'.....1 0.... ....:.;!:...("~ ....L.~bt-l-. <br />3'-0'-00 <br />Ilt'-':TkACl kO,'TI"", "1.lrItbt-~. <br />~ lJ9/M <br /> <br />PROJECT AGREEMENT <br /> <br />$3.720,925 <br /> <br />'TH:S AGREEMEJ.:'I' Diode :.his 19th day of Seotembe: <br />1988. by and between :'he STATE Of COLORADO for ~ne uSe aDe <br />b€n€=it of the DEPAP.T~NT Of NATURAL RESOUR:ES and th€ COLORADO <br />WATER CONSERVA":'ION BOARD. 1313 Sherman S:.reet. Denve::. Colorado <br />80203 (h€r€inafter ca11€d Owner) and th€ UTE MOm,TAIN UTE TRIBE <br />(~ne TRIBE) acting by and through the ~~EMINUCHE CONSTRUCTION <br />AUTHOR!":Y for t.he use ano bene:i:. of t.he TRIBE. P.O. Box AJ... <br />j'o\Jaoc. Color-a.oo a:334 (hereinaft.€r cCilleo COI\:TRACTOR). <br /> <br />\o\'H~REAS. aUThonlY ell.lSl~ U1 Int U\\' and Fun05 haw ftetofl huo,eTtc. approorialed and Otr'II:rwtse made <br />...il.,bir and ;j 5urrlc,enl unC'ncumbered hllll3nce Thereof remaim av...iiable for pa~menl In rune t-.umoe: to 0 () t:' <br />5 -:.... '))' / I/r' ;>..--,(- <br />G/L A.:cnunl ""umlK'T .,J':'_ ". Conlflilcr EncumoranC't humoer' .... -"-'" . and <br />~~~ Account No. 13220, Ors. Unit i7-77-i77, <br />WHEREAS. fel!ulfeC aflT"fUvOIl. Cit:lr:mL"e 3nd coordinalion na~ bee-r\ accomplished horn and Wllh 1II1'f1fonriaTt' <br />a,e-nclts: .nd <br /> <br />WHEREAS. the State has entered into the Colorado Ute Indian <br />Water Rights Final Settlement Agreement of December 10. 1986 <br />(the "final Settlement Agreement"). with the United States, the <br />Ut€ Mountain Ute Indian Tribe. and others, which final <br />Se~tlement Agreement requires. inter alia. the State to <br />construct a pipeline for the transportation of water from the <br />water treatment plant of the City of Cortez. Colorado. t.o the <br />Town of Towaoc on the Tribe's reservation in Colorado (the <br />"Pro j ect II); ana <br /> <br />WHEREAS. the Colorado 'Water Conservation Boara (t.he IICWCB") <br />has been authoriz€d by sections 1 and 4 of chapter 230, Session <br />Laws of Colorado 1986. to construct the Project in ful=illment <br />of the Pinal Settlement Agreement. and to cont.ract directly <br />with the Ute Mountain Ut.e Tribe ~ithout. ut.ilizing t.he <br />procedures prescribed by article 52 of t.itle 2' and part 14 of <br />ar~icle 30 of title 24 for t.he 6esign and const.ruction of th~ <br />project so long as the CWCB. in it.s sole discretion. :in6s that <br />the required work can be satisfactorily performec; and <br /> <br />k~EREAS, the Weeminuche Construction Authority (WCA) is a <br />Wholly owned SUbsidiary of the Tribe whicb is operat.ed <br />exclusively by the TRIBE. and it. was t.he legi~lative int.ent. of <br />section 4 of chapter 30 Session Laws of Colorado. 1986. to give <br />CWCB au~hori~y to con~=act direc~ly with t.he WCA. on behalf of <br />the TRIBE; and <br /> <br />WP~REAS. by their signa~u=es hereto bo~h the TRIBE ana the <br />Contractor agree t.o be bound by t.he terms of this Agreement; <br />and <br /> <br />WHEREAS, the CWCB, has founc that the requir€c project work <br />can be sat.isfactorily performed by t.he TRIBE. acting by ane <br />through its wholly own€d SUbsidiary the WCA; and <br /> <br />WHEREAS, the pipeline project is a component 0= the <br />p~oposec settlement of t.he Ute Mountain Ute TRIBE's reserved <br />wat.er rights claims on cert.ain t.ributaries of the San Juan <br />river; and <br /> <br />k~EREAS. the S~at.e of Colorado Att.ornev Generalis O:=ice <br />has certified to t.he CWCB that. t.he TRIBE h~s en:.erec into a <br />binding set.tlement ~ith the Stat.e which has been approved by <br />the Secretary of the In~erior ano which ~ill auantifv and <br />resolve all the TRIBE's reserveo water riahts~claims~ in <br />Coloraao; ana - <br /> <br />Page 1. of ~ <br />EXHIBIT A <br />