My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00233
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153528
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4.3.1 of the General Conditions are for information only and <br />are not a part of the Contract Documents. <br /> <br />7.4 CONTRACTOR has reviewed and checked all information <br />and data 6hown or indicated on the Contract Documents with <br />respect to existing Underground Facilities at or contiguous to <br />the site and assumeS responsibility for the accurate location <br />of said Underground Facilities. No additional examinations. <br />investigations. explorations. tests. reports. studies. or <br />similar information or data in respect of said Underground <br />Facilities are or will be required by CONTRACTOR in order to <br />perform and furnish the Work at the Contract Price. wLthin the <br />Contract Time. and in accordance with the other terms and <br />conditions of the Contract Documents. including specifically <br />the provisions of paragraph 4.3 of the General ~onditions. <br /> <br />7.5 CONTRACTOR has correlated the results of all such <br />observations. examinations. investigations. explorations. <br />tests, reports and studies with the terms and conditions of the <br />Contract Documents._ <br /> <br />7.6 CONTRACTOR has given ENGINEER written notice of all <br />conflicts. errors. or discrepancies that CONTRACTOR has <br />discovered in the Contract Documents and the written resolution <br />thereof by ENGINEER is acceptable to CONTRACTOR. <br /> <br />7,7 CONTRACTOR has Obtained or will obtain in a timely <br />manner all necessary approval and/or permits to~perform.the <br />work. including but" not"-limited .to approvals, "it any. required-- <br />from the U.S. Department of the-Interior. <br /> <br />Article 8, CONSTRUCTION. CONTRACT DOCUMENTS - :.:. ,: <br /> <br />The Contract Documents which comprise the entire Agreement <br />between OWNER and CONTRACTOR concerning the Work are hereby <br />incorporated beIein by this reference. The Contract Documents <br />.consist of the following: <br /> <br />8_1 This Agreement (pages 00500-1 to 00500-8. inClusive). <br />8.2' Schedule of Values <br /> <br />8,3 Performance Bond <br /> <br />8.4 Payment Bond <br /> <br />B.5 Contractor's Certificate of Comprehensive Liability <br />Insurance <br /> <br />8.6 COE 404 Permit <br /> <br />8.7 BrA Reservation Access Permit <br /> <br />8,8 CDOH Utility Permit <br />8.9 General Conditions <br /> <br />B.10 Drawings <br /> <br />B.ll Specifications <br /> <br />8,12 The fOllowing which may be deliVered or issued after <br />the Effective Date of the Agreement and are not attached hereto: <br /> <br />8.12.1 Initial Notice to Proceed <br /> <br />8.12.2 Interim Notice to Proceed for Division II of the <br />, WORK. <br /> <br />Page B. of JJ Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.