My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00231
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153402
Contractor Name
Fort Lyon Canal Company
Water District
0
County
Bent
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, " <br />" <br /> <br /> <br />" <br /> <br />v <br /> <br />. <br /> <br />Form 6.AC.01A <br /> <br />$27,000 <br /> <br />CONTRACT <br /> <br />THIS CONTRACT. made this 1st day of March <br />Stale of Colorado for the use and benefit of the Department of '1 <br />(Colorado Water Conservation Board} . <br />hereinafter I'('ferred to as tbe State. and'2 the Fort Lyon Canal <br />P. O. Box 23]. Las Animas. Colorado B1054. <br />hereinafter referred to as the contractor, <br /> <br />1983, by and between the <br />Natural Resources <br /> <br />Company. <br /> <br />WHEREAS. authority exists in the Law and Funds have been budgeted. appropriated and otherwise made <br />available and a surficient unencumbered balance thereof remains ava~e ~ payment in Fund Number 4008 . <br />G/l Accounl Number 5261X. Contract Encumbrance NumberC 3- ~nd <br />ABL Account Number 12610, Org. Unit 77-77-777, <br />WHEREAS. re4uired approyal. clearance and coordination has been accomplished from and with appropriate <br />agencies; and <br /> <br />WHEREAS, pursuant to the provisions of section 37-60-119, <br />Colorado Revised Statutes 1973, as amended, the State is <br />authorized to construct certain water projects for the benefit of <br />the people of the State of Colorado; and <br /> <br />WHEREAS, the Fort Lyon Canal Company has made application to <br />the State for the improvement of its existing facility, and <br /> <br />WHEREAS, the Contractor is a canal company within the State <br />of Colorado; <br /> <br />NOW THEREFORE, it is hereby agreed that <br /> <br />1. The Contractor shall have a feasibility report prepared <br />and directed to the prOblem of repairing and improv ing the <br />facilities of the Fort Lyon Canal Company in accordance with a <br />proposal for a project feasibility report prepared by the <br />consulting engineering firm of Tipton and Kalmbach, Inc. (the <br />Consultant), and approved by the State, received on December 21, <br />1982, which proposal is attached hereto as Appendix A and made a <br />part of this contract. <br /> <br />2. Fifteen (15) copies of the final report called for in <br />this contract shall be furnished to the State not later than <br />May 30, 1983, unless such time is extended by mutual agreement of <br />the parties hereto in writing. <br /> <br />3. As compensation for the services of the Contractor, the <br />State shall pay to the Contractor the sum of Twenty-Seven <br />Thousand Dollars ($27,000) in the manner following: <br /> <br />a. Sixty percent (60%), to wit, Sixteen Thousand Two <br />Hundred Dollars ($16,200) of the total amount due in two <br />(2) monthly installments of Eight Thousand One Hundred <br />Dollars ($8,100) each, commencing on April 1, 1983. <br /> <br />b. The remaining forty percent (40%), to wit, Ten <br />Thousand Eight Hundred Dollars ($10,800) within forty <br />(40) days fOllowing receipt and acceptance of the <br />written report specified in paragraph 2 of this <br />contract. <br /> <br />4. The total cost of services to be rendered for the <br />Contractor by the Consultant is Fifty-Four Thousand collars <br />($54,000) and the Contractor shall pay the sum of Twenty-Seven <br />Thousand Dollars ($27,000) as agreed to by letter dated January <br />25, 1983, which is hereby attached and made a part of this <br />contract as Appendix B; and in no event shall this payment be the <br />liability of the State of Colorado. <br /> <br />39.5-5301-1014 <br /> <br />Page I of ---A- pages <br />-(See instruclionson reyerseof last page.) <br /> <br />103 <br />fort/lyon <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.