My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00230
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153162
Contractor Name
Eagle, Town of
Contract Type
Grant
Water District
0
County
Eagle
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />~ <br /> <br />Town of Eagle <br /> <br />August 4, 1977 <br />Page 3 " , <br /> <br />Mapping <br />The location of future and existing faci 1 i ties wi II be shown on 1" = 2000' <br />mapping for facilities to be located outside of Town. In Town, proposed <br />facilities will be shown on mapping at a suitable scale provided by the Town. <br /> <br />REPORT <br /> <br />A report will be prepared in 35 copies and extra copies of the report will be <br /> <br /> <br />provided upon request at our cost to reproduce the report. <br /> <br />REMUNERATION <br /> <br />The report will be provided for a lump sum of $4,000 divided as shown on the <br />attached 6chedule. <br /> <br />,Final bi 11 ing wi 11 be made when the report is submitted to the Town. Interim <br />payments will be due monthly on an hourly basis in accordance with the attached <br />rate schedule, plus out of pocket expenditures. Should the work be terminated <br />for any reason, the work completed to date will be billed on an hourly rate <br />basis in accordance with the attached rate schedule. In no case will we exceed <br />the total of $4,000 without receiving prior approval of the Town. <br /> <br />SCHEDULI NG <br />The CWCB has a requirement that the study be completed by September 30, 1977. <br />Provided that we receive authorization to proceed prior to August IS, 1977, <br />we will meet that deadline. <br /> <br />If the Proposal is acceptable to the Town, please return one signed copy <br />of the Proposal to this office, <br /> <br />Yours very truly, <br /> <br />WRIGHT-McLAUGHLIN ENGINEERS <br /> <br />-762-57 MPX <br /> <br />DTS:ms <br />Attachment <br /> <br />By'D('u 'f~~ <br /> <br />Doug 1 as, . Sove rn <br /> <br />ACCEPTED: <br />DATE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.