My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153835A Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153835A Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:44:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153835A
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table ID-5 <br /> <br />Hazard Classification Summary <br /> <br /> <br />Westerdoll <br /> <br />.......................................-.-..-.-.-.-.....-.................-.',...........................................................-. <br />II~ft~I~I&~~!ljj~. l~fjjj~11 <br />.................................................-.....-................................................. <br />....... ..........------.-.............. ......... <br />50 % PMP(Class IT) <br />100- Y ear <br /> <br />Class III (Future Class IT) <br />Class III <br /> <br />Upper and Lower Hoffinans <br />Heinricy <br /> <br />Non-Jurisdictional <br /> <br />N/A <br /> <br />Boyd <br /> <br />Class I <br /> <br />75 % PMP <br /> <br />Horseshoe <br /> <br />Class IT <br />Class III (Future Class I) <br /> <br />50 % PMP <br /> <br />Equalizer/Houts <br /> <br />75 % PMP <br /> <br />To determine the critical design PMP, two storms were considered: 1) local storm and 2) <br />general storm. The local and general storms were calculated based on the National Weather Service <br />publication Hydrometeorologic Report No. 55A. The 100-year storm was calculated based on the <br />National Oceanic and Atmospheric Administration (NOAA), Precipitation-Frequency Atlas of the <br />Western United States, Volume Ill- Colorado. The precipitation resulting from these storms for the <br />four models are summarized in Tables Ill-6 through Ill-9. <br /> <br />The United States Army Corps of Engineers computer model, HEC-1, was used to evaluate <br />the inflow design floods for each of the reservoirs based on the storm precipitation depths in the <br />previous listed tables. The storm precipitation depths were used to create a hypothetical storm. A <br />runoffhydrograph based on the storms was determined in HEC-1 using the United States Bureau of <br />Reclamation (USBR) dimensionless unit hydrograph procedure. The dimensionless unit hydrograph <br />developed for Urban and Great Plains regions were used to develop the synthetic unit hydro graphs <br />as input into the HEC-1 models. <br /> <br />E:\G&LREPOR. WPD <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.