My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00226
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153430
Contractor Name
Manvel Canal and Irrigation Company
Water District
0
County
Prowers
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />5. In consideration of the State assuming a portion of the <br />cost of the preparation of the said .project feasibility report, <br />the Contractor shall pay to the State the sum of Twelve Thousand <br />Nine Hundred '.Fifty Dollars ($12,950) provided that construction <br />of the subject water project is initiated within ten (10) years <br />of the date of this contract. The Contractor shall fulfill this <br />obligation irrespective of how." or by whom or to what <br />specifications or plans the subject project is financed, paid, or <br />constructed for so long as construction of the project is <br />initiated within the specified time. <br /> <br />6. In the event the Contractor must make payment pursuant <br />to the terms of paragraph 5 above, then the said sum of Twelve <br />Thousand Nine Hundred Fifty Dollars ($12,950) shall be payable in <br />ten (10) equal yearly installments of One Thousand Two Hundred <br />Ninety-Five Dollars ($1,295) each, the first installment to be <br />due and payable upon the January 1st next succeeding the <br />initiation of construction on the said water project. Subsequent <br />payments shall be due and payable on January 1st of each year <br />thereafter. <br /> <br />7. This contract is personal in nature and assignment of <br />performance by the Contractor to another is prohibited unless <br />prior approval in writing is granted by the State. <br /> <br />8. The Contractor is an independent contractor and as such <br />is not entitled to any benefits of the State personnel system. <br /> <br />9. All notices, correspondence, or other documents required <br />by this contract shall be delivered or mailed to the following <br />addresses: <br /> <br />a. For the State <br /> <br />b. For the Contractor <br /> <br />Director <br />Colorado Water Conservation Board <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />Attn: Nick Ioannides <br /> <br />Mr. Michael K. Higbee <br />President <br />Manvel Canal and <br />Irrigation Company <br />P.O. Box 256 <br />Granada, CO 81041 <br /> <br />Page 2 of 4 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.