My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00223
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2012 11:31:49 AM
Creation date
10/5/2006 11:44:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153723
Contractor Name
Orchard Mesa Irrigation District
Contract Type
Loan
Water District
0
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE V-A <br /> <br />PROGRAM FOR PHASED CONSTRUCTION <br /> <br /> Pipe Diameters <br />Ehase Sta. to Sta. Length fYC fE Concr. <br />1 10+44* to 94+ 15 8371 ft. 24"-30" 26"-32" 30" <br />2 94+ 15 to 147+38 5323 ft. 27" 28" <br />3 147+38 to 225+30 7792 ft. 21 "-27" 22"-28" <br /> 21,486 ft. <br /> <br />*Station 10+00 is the start of the project. The tie-in to Canal No. 1 and trash <br />rack extends from Sta. 10+00 to 10+44. The pipeline starts at Sta. 10+44. <br /> <br />V-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.