Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE V-A <br /> <br />PROGRAM FOR PHASED CONSTRUCTION <br /> <br /> Pipe Diameters <br />Ehase Sta. to Sta. Length fYC fE Concr. <br />1 10+44* to 94+ 15 8371 ft. 24"-30" 26"-32" 30" <br />2 94+ 15 to 147+38 5323 ft. 27" 28" <br />3 147+38 to 225+30 7792 ft. 21 "-27" 22"-28" <br /> 21,486 ft. <br /> <br />*Station 10+00 is the start of the project. The tie-in to Canal No. 1 and trash <br />rack extends from Sta. 10+00 to 10+44. The pipeline starts at Sta. 10+44. <br /> <br />V-4 <br />