My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00223
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2012 11:31:49 AM
Creation date
10/5/2006 11:44:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153723
Contractor Name
Orchard Mesa Irrigation District
Contract Type
Loan
Water District
0
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3. Performance of Mutual Mesa Project. <br /> <br />MMLE was formed for the limited purposes of: (i) contracting with one or <br />more lenders for the funds necessary to complete the Mutual Mesa Project in <br />one or more phases; (ii) contracting with one or more contractor(s) for the <br />goods, services, materials and labor required to complete the Mutual Mesa <br />Project in one or more phases; (iii) owning, during the life of any loan <br />required to construct the Mutual Mesa Project, new structures and facilities <br />installed or constructed as part of the Mutual Mesa Project; and, (iv) <br />performing all future major maintenance and repairs of those portions of the <br />Mutual Mesa Lateral piped or improved by the Mutual Mesa Project. MMLE <br />has all powers granted water activity enterprises under the provisions of <br />C,R,S, ~~ 37-45.1-101 to 107, including, without limitation, those powers <br />more specifically set forth in the MMLE Resolution, <br /> <br />On October 29, 1996, the Board of the District adopted a resolution assigning <br />to MMLE certain of the District's rights to enter into the contractor <br />agreements necessary to perform the Mutual Mesa Project. In addition, by <br />Agreement of the same date, the District and MMLE memorialized the terms <br />and conditions under which MMLE would undertake the Mutual Mesa Project <br />on the District's behalf. It is contemplated that both the District and MMLE <br />will be signatories to any loan contract with the CWCB, with MMLE being <br />the actual borrower. <br /> <br />Neither the formation of MMLE nor its participation in completing the Mutual <br />Mesa Project affects the continuing applicability and validity of other <br />information contained in this study relating to the economic or technical <br />feasibility of the Mutual Mesa Project. <br /> <br />11-16 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.