My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00221
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:14 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0017X
Contractor Name
Ouray, City of
Contract Type
Loan
Water District
0
County
Ouray
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />I <br />I <br />,II <br /> <br />E. <br /> <br />Feasibility <br /> <br />Construction Feasibilitv: <br /> <br />As noted under the discussion regarding alternative evaluation, the two selected <br />construction methods proposed for bidding are the most feasible and economic <br />approaches. On-site material will be utilized as much as possible to mitigate the difficult <br />access to the site, which requires helicopter transport of construction materials. Site <br />visits were conducted as discussed above to ensure the feasibility of the proposed project. <br />The no-action alternative is not considered feasible due to the safety risk and financial <br />loss in the event of failure of the existing diversion wall. <br /> <br />Benefit/Cost Analysis: <br /> <br />1. Damage Estimates: Mussetter Engineering prepared a damage estimate as part of <br />the CaE design project (see appendix: Skyrocket Creek Debris Flow Analysis). Costs <br />for repair to public facilities were considered under several failure scenarios. Estimated <br />damages for the lOO-year debris flow ranged from $435,795 to $716,095. The average of <br />$575,945 was used for the annual cost estimate. Damages did not include damages to the <br />highway and adjacent utilites. <br /> <br />2. Indirect Losses: Additional indirect losses will result from closure of the pools. <br />The monthly revenue generated from the Ouray City Hot Pools during July, August and <br />September averaged approximately $98,600 in 1999 and has increased every year since <br />1996. It is also anticipated that closure of the pools will have a direct impact on tourist <br />visits and sales tax income will be impacted. Monthly sales tax revenue for these same <br />months averaged $69,363 for 1999 and also shows an annual increase. For the 100-year <br />event we will asswne pool closure of 1 month and 50-percent loss in sales tax revenue for <br />the same month, although the true impact of a severe event and resultant pool closure <br />could extend well beyond one month. Indirect costs due to pool closure and loss in sales <br />tax is estimated at $133,300. <br /> <br />3. Annualized benefits: Total losses due to damage repair and indirect losses of <br />revenue and sales tax is estimated at $709,245 for the 100-year event. Asswning no <br />damage due to a 2-year event and using a standard forecast evaluation of cost of damages <br />for events between the 2 and 100-year debris flow, average annual damages for the <br />failure were calculated by plotting estimated damages against probability (see figure 3). <br />The area beneath the curve on this plot is the average annual benefits (avoided costs) and <br />is estimated at $32,000 based on this methodology. This asswnes damage costs for <br />events over the 100-year occurrence are the same as for the 100-year event. This does <br />not account for interest that will be paid by the City if money is borrowed to make <br />repairs. <br /> <br />4 Annualized Cost of Project: Annualized costs are based on a construction loan of <br />$90,000 to be paid back over 30-years with annual interest rate of 5%. Total costs for the <br />loan with interest and principal are estimated at $175,000. It is anticipated that this <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.