Laserfiche WebLink
<br />,~ <br /> <br />:." <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />.:"...- <br /> <br />. <br /> <br />. <br /> <br />i Estimated Study Costs <br /> <br />. <br /> <br />The tables below list the items described above for each stage <br />and the man-hout'S associated with each. "The Harris Water Engineering <br />contract would be for actual charges or the amount for the appraisal <br />stage ($4,900) whichever is less. A similar arrangement would be <br />Made fOt~ the feasibility stage but the not-to-exceed amount would not <br />be determined until after the appraisal stage. In any event the <br />total contract price fot' the entire study will not exceed $23,000. <br /> <br />Appt"'aisal Stage <br /> <br />Item <br /> <br />1 <br /> <br />i:::: <br /> <br />,:, <br /> <br />Ma.......-h 0 Ut"'S <br /> <br />l1f <br />6t.~1 <br />20 <br /> <br />l"otal Man-hours 94 <br /> <br />Man-hour cost at $45 <br />Other costs (typing, <br /> <br />pel""' houl""' <br />copies, etc. <br /> <br />Total Appraisal- Stage Cost <br /> <br />Feasibility Stage <br /> <br />Item <br /> <br /> 1 <br /> 2 <br /> ,:, <br /> if <br /> 1,;;,- <br /> -' <br /> (-J <br />'1 " 8 <br />" <br /> <br />Si.,231l.1 <br />'.';IS 71/.1 <br /> <br />'$4, (]!.ZI!.:I <br /> <br />iyla....I-~holJi"...s <br /> <br />".~, <br />c <br /> <br />24 <br />'+1l1 <br />155 <br />20 <br />30 <br />LHi.) <br /> <br />Total Man-hours 311 <br /> <br />Man-hour cost at $45 per hour <br />Field Work SIJbcontractors <br />Dl""'a ft i "'-Ig <br />Uther costs (typing, copies, etc) <br /> <br />T()tal Feasibility Stage Cost <br /> <br />$13,995 <br />~52, 0~)lt.i <br />$51Z1tZI <br />":f;1, GID~3 <br /> <br />":p 1 \3, 11.:lIZ1 <br />