My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153321 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153321 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:41:10 AM
Creation date
10/5/2006 11:44:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153321
Contractor Name
Ridgway, Town of
Contract Type
Loan
Water District
60
County
Ouray
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />1 <br />1 <br />I <br />I <br /> <br />of this land is. privateCly'owned anti as' previous'ly n.oted; it is J: <br /> <br />felt that condemnation will be needed to secure the required' "' <br /> <br />easements. A 10 foot permanent utility easement and a 20 foot <br /> <br />construction easement will be needed. <br /> <br />Some rights of way will be needed from the County as a <br /> <br />section lies on the County Road. <br /> <br />The storage tank and treatment plant are located on Town <br /> <br />owned property. <br /> <br />The transmission line from the storage~Bnk to the Town's <br /> <br /> <br />distribution system will require a permit from ,the Countyalthbugh <br /> <br /> <br />the existing waterline lies in the road. <br /> <br /> <br />5. Alternate IVa (revised): <br /> <br /> <br />Requirements for right-of-way easements and lor direct land <br /> <br />purchase will be similar to those as mentioned in Alternate IV. <br /> <br />However, in paralleling the.existing Ridgway-Ditch, the right of <br /> <br />adverse possession may be employed. The route, in being more <br /> <br />direct, will require less easements. Again, a 10 foot permanent <br /> <br />utility easement and a 20 foot construction easement will be needed. <br /> <br />6. Town Distribution System: <br /> <br /> <br />The transmission line lying along Highway #62 will require a <br /> <br /> <br />utility right-of-way permit from the Colorado State Highway Department. <br /> <br /> <br />All other waterlines lie on Town streets and will not require a permit. <br /> <br />All streets, easements and rights of way in Alternates I, II, III, IV <br /> <br />and IVa (revised), and the Town's distribution system will be returned <br /> <br />to a condition equal to or better than the present existing condition. <br /> <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.