My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153514 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153514 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:22 AM
Creation date
10/5/2006 11:43:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153514
Contractor Name
Farmers Water Development Company
Contract Type
Loan
Water District
60
County
San Miguel
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. / .......~..'.c;:-o1.~. fR SIB" <br />. 'r/'f~rmf;.PB Q <br />,A"';"'~'f;" -"ley Dam <br /> <br />N1ENDMEN'I' if 2 <br />PROJECT <br />CONTRACT <br /> <br />THIS CONTRACT, mad< th;, 1/ /C .av. 01 ~CAU"R~~ ~ <br />" -- ~ -_ 198. by and between the <br />Slale of Colorado for the use and hendil of tile Department of"' Natural Res urces <br />(Colorado Water Conservation Board) , <br />hertinaftf'r tTfCl'1"ed to as the State, :md.2 the Farmers Water Development Company, <br />Box 387, Norwood, Co 81423, <br />her\!inafter referred tn as the cnnUactor /Contractot'. <br /> <br /> <br />. WHEREAS, all~horilY ell.isls in the law and Funds have been budgeted. appropriated and otherwise made <br />available and a sUmcll~nl unencumMrtd balante thereof remains available for payment in Fund ."iumhn 4008 <br />G/L Aceount Number 5370X. Conlract Encumbrance Number C153514; and ' <br />ABL Account No. 13700, Org. Unit 77-77-777, <br /> <br />.WHEREAS. rt4uired apllfI)VlIl. c:ltarnm:t and coordination has; betn accomplished hom and with appropriarl! <br />a8entle5; and <br /> <br />WHEREAS. a contract was entered into on June 22. 1988. <br />Contract Encumbrance Number C-1S3514 (the Original Contract). <br />between the State and the Contractor: and <br /> <br />WHEREAS. a contract amendment was entered into on November <br />4. 1988, Contract Encumbrance Number C-153514 (Contract <br />Amendment *l)~ between the State and the Contractor: and <br /> <br />WHEREAS. construction of the project has now been completed <br />at an amount less than what was anticipated when Contract <br />Amendment #1 was written: and <br /> <br />WHEREAS. it is now necessary to reduce the money made <br />available to the amount of money necessary to complete <br />construction. <br /> <br />NOW THEREFORE, it is hereby agreed that: <br /> <br />1. <br /> <br />This Contract Amendment #2 is a supplement to Contract <br />~mendment #1 (Appendix A). which is by this reference ~ <br />incorporated and made a part hereof: and all the terms. <br />conditions. and provisions thereof. unless specifically <br />modified herein. are to apply to this contract amendment as <br />though they were expressly rewritten. incorporated. and <br />included herein. <br /> <br />2. The only modifications. alterations, or changes in Contract <br />Amendment #1 shall be that Attachment B and paragraphs B.11. <br />0.1.. and J. shall be deleted and in their place Appendix B <br />and the following paragraphs shall be inserted: <br /> <br />B. The Contractor agrees that it shall: <br /> <br />11. Repay to the State the total principal sum of Eight <br />Hundred Twenty-Eight Thousand Four Hundred One Dollars <br />($828.401), which includes the project loan amount and <br />the Sixty-thousand-Dollar ($60.000) feasibility report <br />amount. together with interest at the tate of five <br />percent (5\) per annum, said repayment to be made in <br />constant annual installments of Forty-Eight Thousand Two <br />Hundred Seventy-Seven Dollars and Sixty-Nine Cents <br />($48.277.69) each. for forty (40) years. as shown in <br />Appendix B. attached hereto and .incorporated by reference <br />herein. which first installment shall be due and payable <br />on December 1. 1989. and yearly thereafter until the <br />entire principal sum shall have been paid. However. in <br />the event the Contractor does not draw funds commencing <br />on the date specified in paragraph O.l.a. below. the <br />obligation to repay shall be postponed for the <br /> <br />OSOSE* <br /> <br />J9S-5}Q1-1O.\4 <br /> <br />Page I of -2- pag.~s <br />
The URL can be used to link to this page
Your browser does not support the video tag.