Laserfiche WebLink
<br />.', <br />, "j <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRk~ PROCEDURES <br /> <br />1. Board approval of eng ineering firm and eng ineering <br />agreement between engineering firm and project sponsorw <br /> <br />2, Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />office) . <br /> <br />4. Board staff approval of bidding for 'the proje'ct, Board <br />staff present at bid opening for construction, <br /> <br />5. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br />eonstruction schedule by Board staff. <br /> <br />7. Construction commences, The Boa~d staff makes periodic <br />inspections during construction. I-.ll change orders must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone, <br /> <br />8. The consulting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />9. Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />10. Submittal of as-built drawings to Board staff for <br />approval and fil ing. <br /> <br />(Schedule A) <br /> <br />102 <br />sChed/ a <br />