Laserfiche WebLink
<br />. <br /> <br />. , <br /> <br />VII. ESTI~~TED COST OF STUDY <br /> <br />. <br /> <br />The following is given as an estimate of the work items, manpower <br />utilization, ihd estimated cost for the stucy: <br /> <br />Work Item <br /> <br />Aerial mapping of dam area <br />1"=100' <br /> <br />Geotechnical & Geologic <br /> <br />['icld survey for aerial <br />control <br /> <br />Field survey dam alignment <br />and cross-sections 2100' <br /> <br />Drafting of Existing <br /> <br />Drafing of Proposed <br /> <br />Calculate Quantities <br /> <br />Engineering for proposed <br />improvement, quantities, <br />cost estimates, financial <br />and rcpo rt <br /> <br />Meetings <br /> <br />Typing <br /> <br />Copies and Blueprints <br /> <br />Other expenses <br /> <br />Person <br />Assigned <br /> <br />Kucera & <br />Associates <br /> <br />Hours & Rates <br /> <br />Amount <br /> <br />$ 1,160.00 <br /> <br />8,700.00 <br /> <br />2,250.00 <br /> <br />2,550.00 <br />1,200.00 <br />1,200.00 <br />550.00 <br />600.00 <br />1,360.00 <br />2,750.00 <br /> <br />660.00 <br />1,200.00 <br />520.00 <br />300.00 <br /> <br />Total $25,000.00 <br /> <br />VIII. ADDITIONAL INFORNATION <br /> <br />Chen & Assoc. <br />3 man crew 30/hr5. @ $75.00 <br />3 man crew 34/hrs. @ $75.00 <br />Rushing 40/hrs. @ $30.00 <br />Rushing 40/hrs. @ $30.00 <br />~lalcolm 10/hrs. @ $55.00 <br />~ushing 20/hrs. @ $30.00 <br />Bruns 20/hr5. @ $68.00 <br />~Ialcolm 50/hrs. @ $55.00 <br />Malcolm l2/hrs. @ $55.00 <br />Ilracsch 80/hrs. @ $15.00 <br /> <br />We have included proposals received from Chen and Associates to <br />complete the Geologic and Geotechnical information for this project; <br />and from Kucera and Associates for the aerial topography. <br /> <br />~ - <br />