My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00212
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:43:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153449
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 85-1042
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />, <br /> <br />., C. Chapter III - Land <br />1. Land Classification - <br />This proj~ct is to serve presently irrigated lands. <br /> <br />~ <br /> <br />D. Chapter I~ - Water <br />This project does not require any additional water rights. <br />The project will restore storage of surface water to the <br />original 1903 decree. <br /> <br />E. Chapter V - Plan of Development <br />The Plan of Development will be represented by updating the <br />1975 Report. Specific Engineering items include: <br />1. Aerial Topography <br />We will have Kucera and Associates, Inc. complete a pencil <br />manuscript of the Dam and Spillway area at a scale of <br />1"=100' \dth l' contours, <br /> <br />2. Field Survey Cross-sections - <br />We will complete field survey cross-sections of the existing <br />dam at 100.foot intervals. <br /> <br />3. Geologic and Geotechnical - <br />We will employ Chen and Associates, Inc. to provide <br />additional Geologic and Geotechnical investigation of <br />the site including. <br /> <br />a. 3 test holes through the embankment <br />b. 2 test holes at the toe <br />c. 0 monitoring holes into embankment <br />" <br />d. Laboratory testing <br />e . Stability analysis of proposed section <br />f. Geologic Report <br /> <br />4. Preliminary Drawings - <br />We will prepare preliminary drawings of existing con- <br />ditions and proposed improvements. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.