Laserfiche WebLink
<br />I. ': ' <br /> <br />", <br /> <br />l <br />I <br />] <br />I <br />I <br />I <br />, <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />-j <br /> <br />) <br /> <br />II 1. WORK PLAN <br />A, Organi zation <br />The work on this project will be accomplished out of our Longmont <br />Office under the management of Robert Brand, The Project Team will be composed <br />of the following personnel: <br />Jennifer Rodriguez - Project Planner <br />Leon A. Wurl - Project Coordinator <br />Michael Ballantine - Project Engineer <br />Colby Hayden - Engineering Technician <br />Ronald Adams - Surveying <br />The water quality testing is a substantial portion of the study and <br />will be performed by a local testing laboratory, The Central Weld Water <br />District segment will be performed by the District Staff. <br />B. Accomplishment <br />Rocky Mountain Consultants, Inc, personnel are prepared to start work <br />on this project as soon as a contract is signed. <br />It is anticipated that a draft copy of the study will be available on <br />or before November 1, 1986 with the Final Report completed by December 15, 1986. <br /> <br />-6- <br />