My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00210
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:43:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153325
Contractor Name
West Divide Water Conservancy District
Water District
0
County
Garfield
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. ./ A <br />I <br />. <br />. <br />I <br />. <br />II <br />I <br />I <br />. <br />I <br />I <br />. <br />I <br />. <br />I <br />o <br />. <br />. <br /> <br />. <br /> <br />. <br /> <br />to supply the area for the 1nter1m per10d until the West Divide <br />Project commences operation -- about 1990, according to present <br />estimates. <br /> <br />PROPOSED PROJECT <br /> <br />The project as described in this report proposes the construction <br />of a water system by the end of 1981 which will supply the pro- <br />jected water needs of the area through the year 1990 when the West <br />Divide Project is expected to go 1nto operation. <br /> <br />The water supply will be obta1ned by d1rect diversion from the <br />Colorado River under water r1ghts transferred by the West Divide <br />Water Conservancy District from the West Divide Project decrees on <br />the Crystal River, augmented by releases from storage in Green <br />Mountain or Ruedi reservoirs at times when the West Divide Project <br />rights would be called out. <br /> <br />The proposed project cons1sts of the construction of an intake and <br />silt exclusion structure on the Colorado River, a raw water pumping <br />station, a one million gallon per day (mgd) package-type water treat- <br />ment plant, a one million gallon treated water steel storage tank, <br />and 2,100 lineal feet of 14" and 2,300 1 ineal feet of 8" water supply <br />pipelines, Water would be supplied to the Rifle Village South Metro- <br />politan District, to the Southside Center, and to other potential <br />water distribution systems at wholesale rates. The total estimated <br />cost of the proposed project including construction costs, contingen- <br />cies, land and rights-of-way, engineering, and legal and administrative <br />costs is $1,460,000 in December 1981 dollars, <br /> <br />- 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.