My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00207
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:43:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0020X
Contractor Name
Paonia, Town of
Contract Type
Loan
Water District
0
County
Delta
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Feasibility Report for Improvement of Paonia's Water Supply System <br />Town of Paonia <br />April 21, 2000 <br /> <br />The growth scenarios discussed above are projected average annual increases in the number of <br />residents within the Town boundaries, Residents of the service area living outside the Town are <br />projected to increase at 1.5 times the in-Town growth rate, except under Scenario C where a <br />growth rate in the area outside the Town boundaries of 4 percent per year compares with a <br />projected in-Town growth rate oD percent per year, <br /> <br />-- <br /> <br />Population Growth Projections <br /> <br />\.~i:t, <br /> <br />. .. <br />Figure 4.5 provides a graphical depiction of projected population gro~ under'ihe three growth <br />scenarios, Under Scenario A, water service area population would iIiciease from about 2,825 <br />at present to 4, I 00 by 2020 and 4,900 by 2030, Under Scenilrio B, th6.si;fvice area populatiQn <br />"" " . ",. ".) <br />would reach 4,750 by 2020 and 5,700 by 2030, Under Scenario._C, there_\Vllllld be 5~ZOO <br />residents in the service area by 2020, but buildout would be reached before 2030 [Lbland, 1996], <br />:/ . ..';,- "'~'-~rf{;f/~j;;..-/ <br />Water Demand Projections""'''''' <br /> <br />By combining the population growth scenarios just described with the per capita water demands <br />discussed earlier in this technical memorandum, BBC projected J'utilremetered water demand <br />for the Paonia water system. Table 4,2 provides a sjimmary of pi6je~te(fannual water demand <br />for the in-Town and out-of-Town portions of the se,rviceijrea in 20io and 2030, <br /> <br />_,..':~BLE 4~:'" ;"\f~~':,):..u,;!t... <br /> <br />:'>,., <br /> <br /> - <br /> 81 111 129 <br /> 45 73 91 <br />:~::i.- ,Total 127 184 220 <br />.~. ." SceriarioB - CDLG Based <br />, .' <br />In-town 81 125 146 <br />Outside Town 45 87 109 <br /> Total 127 212 255 <br />Scenario C - Unanticipated Event <br />." . <br />In~town 81 151 203 <br />Outside Town 45 104 153 <br /> Total 127 255 356 <br /> <br /> <br />PROJECTED ANNUAL METERED WATER DEMANDS <br />/:~{j(Millions of Gallons) <br />8"'" :~1. "~' . <br /> <br />tf\ <br />SH GEl Consultants, Inc. <br /> <br />4-6 <br /> <br />J.\PROIECTS\99368\ReportsIFcasibility.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.