Laserfiche WebLink
<br />" <br />.',/ "inrn'lh A('.{)2A(R5/1151 <br />/ -' <br />, <br /> <br />--. <br /> <br />IjC~71/"'~ <br /> <br />C>133l{Sj <br />~;V;'8.x <br /> <br />ut'.P'\~~' T OR AGENCY ~U~BER <br />3, .,j-OO <br /> <br /> <br />FEASIBILITY REPORT <br />CONTRACT <br /> <br />$10,250 <br /> <br />THIS CONTRACT, made this 15th day of October 198 ~. by and between the <br />Slatc of Colorlldo for the use and benefit of the Department of " Natural Resources <br />(Colorado Water Conservation Board), <br />hereinafter f",ferred to as the State, and '2 'the Colorado River' Water .Conservation District. <br />P.O. Box 1120. Glenwood Springs. co 81601. and the City of .Craig, 300 West'~. <br />,.. Fourth St., Craig, CO 81625, h.ereinafter referred to. collectively as the <br />Contractor. <br />WHEREAS. authority cxisl~ in the Law and Funds have been .budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered b,~Jallce thereof remains :l)1lilable for payment in. Fund Number 4008 <br />G/L Account Number5278X . C()ntrac~nctlmbrance NumberL1534-81 : and ., . <br />ABL Account Number 12780, Org. Unit 77-77-777, . <br />WHEREAS. re4uircd appro...:!!. dcnr:lIlce and coordination has been accomplished from and with appropriate <br /><'Jgencics: and <br /> <br />WHEREAS. pursuant to the provisions of section. <br />37-60-119,Colorado Revised Statutes. as amended. the 'State is. <br />authorized to construct certain water. projects for the benefit <br />of the people of ihe State of Colorado~ and <br /> <br />WHeREAS, the City of Craig has made application to the <br />State for the enlargement of Elkhead Reservoir. such <br />enlargement is hereinafter sometimes ,referred to as the <br />project: and <br /> <br />WHEREAS. the Contractor is a city and a.water conservation <br />district within the State of Colorado; <br /> <br />NOW THEREFORE, it is hereby. agreed that.: <br /> <br />1. The Contractor shall have a feasibility report prepared <br />and directed to the problem of enlarging Elkhead R~servoir. in <br />accordance ~ith a proposal for a project feasibility. report . <br />prepared by the conSUlting engineering firm of. Morrison-Knudsen <br />Engineers, Inc. (the Consultant), and approved by the State. <br />received September 25, 19B6, which proposal is attached hereto <br />as Exhibit A and made a,part of this contract. <br /> <br />2. Thirty (30) copies of the. final report. called for in <br />this~contract. shall be futnished to the State not later than <br />February 2'. 19B7. unless. such time is extended by mutual <br />agreement of the parties hereto in writirig. <br /> <br />3. As compensation for the services of the Contractor, the <br />State shall pay to the City of Craig the sum of Ten Thousand <br />Two Hundred Fifty Dollars ($10.250) in the manner following: <br /> <br />a. Sixty percent (60\). to wit. Six Thousand One Hundred <br />Fifty Dollars ($6,150) of the total amount due in two (2) <br />monthly installments of Three Thousand Seventy-Five Dollars <br />($3,075) each. commencing on November 1, 1986. <br /> <br />b. The remaining forty percent (40\), .to,.wit, Four <br />Thousand One Hundred Dollars ($4,100). within forty (40) <br />days following receipt and ~cceptance of the written report <br />specified in paragraph 2 of this contract~. <br /> <br />4. The. total cost of services to be rendered for .the <br />Contractor by the Consultant is Twenty Thousand Five Hundred <br />Dollars ($20,500) and.' the ColoradO River Water conservation <br />District shall pay the sum of Ten Thousand Two Hundred Fifty <br />Dollars ($10.250) to the City of Craig; and in no event shall <br />this payment be the liability of the State of Colorado. <br /> <br />5. In consideration of the State assuming a portion of the <br />cost of the preparation of the said project feasibility repoct, <br /> <br />395-5}O"f-1014 <br /> <br />Page I of........!.. pages <br />j(Scl!inStructionson reverse of last page.) <br /> <br />1775E. <br />