My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00202
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:43:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153474
Contractor Name
Oak Creek, Town of
Water District
0
County
Rio Blanco
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! I <br />I <br />I <br />I <br />I <br />I <br />,I <br /> <br />LI ST OF TABLES <br /> <br />1. Summary Oak Creek Water Supply Analysis Without Trout Creek <br />Direct Flow Rights <br /> <br />2. Summary of PMF and Sheriff Reservoir Dam Failure Hydrograph <br />Routing as COMPUTED BY "DAMBRK" <br /> <br />3. Modification Option 2 - Summary Quantity and Cost Estimate <br /> <br />4. Financial Program and Payout Schedule for Sheriff Reservoir <br />Modifications, Oak Creek, Colorado <br /> <br />5. Detailed Amortization Schedules for CWCB Loan <br /> <br />LI ST OF FIGURES <br /> <br />1. Project Location Map <br /> <br />2. Sheriff Reservoir Drainage Basin <br /> <br />3. PMF Inflow Hydrograph for Sheriff Reservoir <br />4. IDA Study Reach and Location of Surveyed Sections <br /> <br />5. Incremental Damage Assessment at Knotts Ranch, 7.2 Miles <br />Downstream From Sheriff Reservoir <br /> <br />6. Option 1 - General Plan of Spillway Enlargement <br />7. Option 1 - Spillway Enlargement Typical Sections and Details <br />8. Typical Spillway Crest and Stilling Basin Cross Section - Option 1 <br />9. Option 2 - General Plan of Soil-Cement Overtopping Protection <br /> <br />10. Option 2 - Typical Sections and Details of Soil-Cement <br />Overtopping Protection <br /> <br />11. Project and Fund Requirement Schedule <br /> <br />APPENDICES <br /> <br />A. Town of Oak Creek Articles of Incorporation <br /> <br />B. 1985 Financial Statement for the Town of Oak Creek <br /> <br />C. Records of Correspondence Between the SEa and the Town of Oak Creek <br /> <br />D. Detailed Cost Estimates, Modification Options 1 and 2 <br /> <br />E. Logs of Exploratory Test Pits <br /> <br />F. Records of Correspondence with USDA Forest Service <br />
The URL can be used to link to this page
Your browser does not support the video tag.