My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C15357 Feasibilty Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C15357 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:43:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153757
Contractor Name
Decker Lateral Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />. <br /> <br />4. <br /> <br />Is the organization incorporated in the State of Colorado? YES J NO_ <br />(If "YES", please include a copy of the articles of incorporation, and the Bylaws with <br />this application fonn.) <br /> <br />5. <br /> <br />Please provide a brief description of the owner's existing water supply facilities and <br />describe any existing operational or maintenance problems, (Attach separate sheets and <br />a map, if needed.): I1AL <br /> <br />~ff ;;.;::;;; b;;. dl7eu-;f f'",u,k <br /> <br />I <br /> <br />6. <br /> <br />For existing facilities indicate: <br /> <br />(Lf}<<)ER .ovo/) <br />(a) the number, of shareholders g 3 , or <br />(b) the number of customers served It.., <br /> <br />. <br /> <br />Part B. - Description of the Project <br /> <br />1. Name of the project orfacility: hl')~A It L IlJd.. ~ . <br /> <br />2. What is the purpose of this loan application? Check one. <br /> <br />_ New project <br />~habilitation or replacement of existing facility <br />_ Enlargement of exis~ng ,~a~i1tty <br />_ Emergency Repair <br />_ Other (describe) <br /> <br />3. <br /> <br />If the project is for rehabilitation of an ,existing reservoir, is the reservoir curre3lY under <br />a storage restriction order from the State Engineer? YES _ NO ~ <br /> <br />. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.