Laserfiche WebLink
<br /> COST ESTIMATE <br /> DECKER LATERAL COMPANY <br />. OCTOBER, 1996 <br />ITEM SPEC QUAN- UNIT <br />NO. ITEM NO. TITY UNIT COST AMOUNT <br />1 Structure Removal 403 1 L.S. $10,000 $10,000 <br />2 Mobilization 408 1 L.S. 5,000 5,000 <br />3 Earthfill, Class C 423 12,000 c/y 1. 90 22,800 <br />4 Concrete, Reinforced 432 28 c/y 550.00 15,400 <br /> Water Control Structure <br />5 CM Arch Pipe, 57 inch 451 40 L.F. 50.00 2,000 <br /> Wide x 38 inch High <br /> Ditch Crossing <br />6 CM Arch Pipe, 42 inch 451 20 L,F. 35.00 700 <br /> Wide x 29 inch High <br /> Ditch Crossing <br />7 Contractor Quality 494 1 L.S. 1000.00 1000 <br /> Control <br />.8 Non-Reinforced Concrete 499 480 c/y 180.00 86,400 <br />Ditch Lining <br /> TOTAL $ 143,300 <br /> <br />. <br />