My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C15357 Feasibilty Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C15357 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:43:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153757
Contractor Name
Decker Lateral Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />NATURAL RESOURCES <br />CONSERVATION <br />SERVICE <br /> <br />4302 W. 9th Street Road <br />Greeley, co. 80634 <br />phone (970) 356-6506 <br /> <br />~nited States <br />...,epartment of <br />Agriculture <br /> <br />. <br /> <br />. <br /> <br />Date: February 15, 1996 <br />To: FSA Weld County Committee <br /> <br />Soil Conservation Distric:t: <br />West Greeley SCD <br /> <br />Subject: Preliminary Engineering <br />report on proposal for <br />Decker Lateral <br /> <br />Field Office: Greeley, CO <br />Job Classification: III <br />Prepared by: <br />Glen Newlon <br />Area 2 Engineer, and <br />Steven Petersen <br />Conservation Technician <br /> <br />Administrative Approval: <br /> <br />F~}14;L <br /> <br />Resource Conservationist <br />Greeley Field Office <br /> <br />1. Job Type, Size, Purpose and Program <br />a. The purpose of the job is rehabilitation of the Decker Lateral <br />of Larimer Weld Ditch System. This WC-4 job will incorporate <br />, NRCS practice codes 428- concrete lined canal, 587- water <br />control structures, and possibly 430- buried pipeline. <br />b. The canal lining (428) will reach approximately 7900 lin ft. It <br />will involve the renovation or rebuilding of 5 control <br />structures in conjunction with the installation of 8 turnouts <br />(587), and the removal of 8 to 10 existing structures. It is <br />possible to install approximately 2200 lin ft of buried pipeline <br />(430) in lieu of canal lining. <br />c. The overall cost of the installation has been estimated to be <br />$140,000 by a contractor. This is seems to be a reasonable <br />estimate in comparison to other projects with similar scope and <br />complexity which have been done in this district in the recent <br />past. <br />d. The project is proposed to be completed under the FSA's ACP <br />program. <br />e. The canal flow is affected beyond the apportioned delivery by <br />slight surcharge from the Eaton delivery ditch and minor off- <br />site areas. <br /> <br />2. Location: <br />a. Legal description: SW 9-, W2 16-6N-64W. <br />b. Location to nearest community: 2 1/2 miles SE of Galeton, CO. <br />c. Approximate elevation: 4825 ft above Mean Sea Level. <br />d. Accessibility: There is good accessibility from 3 county roads. <br /> <br />3. Cooperators: <br />a. Name and type of organization: This project is proposed by 16 <br />shareholders of the Decker Lateral, a part of the Larimer-Weld <br />ditch delivery system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.