My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C15357 Feasibilty Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C15357 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:43:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153757
Contractor Name
Decker Lateral Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Water Rights <br /> <br />The Decker Lateral is a carrier ditch for water delivered by Owl <br />Creek Supply and Irrigation, which itself operates as a carrier <br />ditch. Water is supplied to Owl Creek from several sources <br />(Larimer-Weld, Windsor Canal, Norther Colorado Water Conservancy <br />District, etc.). The actual water rights are the shares owned in <br />the several primary water supply companies or districts, by the <br />individual Decker Lateral shareholders. Ownership of a share in <br />the Decker Lateral represents a right to transport 0.25 cfs of <br />water which the shareholder owns in a separate primary source. <br />There are no separate water wights or State Engineer Diversion <br />Records for the DLC. <br /> <br />There are a total of 230 shares ("carry rights") in the DLC, of <br />which 84 shares are associated with the lower end of the ditch. <br />84 shares allows a total run of 21 cfs (1 share equals 0.25 cfs.) <br />Shares are apportioned to the land in a ratio of one share per 20 <br />acres. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $143,300. <br />and engineering design will be provided by the <br />Conservation Service (NRCS). <br /> <br />Project planning <br />Natural Resources <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Planning and Design Costs by NRCS <br />2. Construction Cost with Contingency <br /> <br />$ 0 <br />$143.300 <br /> <br />Total Cost <br /> <br />$143,300 <br /> <br />The NRCS detailed cost estimate in included in Appendix B. <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br /> <br />Tarqet <br />Completion Date <br /> <br />1. Complete Final Design <br />2. NRCS Approves Design <br />3. Start Construction <br />4. Complete Construction <br />5. Project is Operational <br /> <br />10/01/96 <br />10/15/96 <br />09/15/97 <br />11/15/97 <br />12/01/97 <br /> <br />Feasibility Study <br />Rehabilitation of the Lower Decker Lateral <br />July 1997 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.