My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00200
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:43:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153372
Contractor Name
Hyannis Reservoir Company
Water District
0
County
Jackson
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />~ <br />I <br />I <br />~ <br />I <br />. <br />~ <br />I <br /> <br />j <br /> <br />... <br /> <br />... <br /> <br />~ <br /> <br />J <br />... <br /> <br />,A <br /> <br />.. <br /> <br />l <br /> <br />I <br />I; <br /> <br />. <br /> <br />. <br /> <br />/' <br />7. Right-of-Way I <br />I <br />A discussion of right-of-way requirements; right- <br />of-way available; and if additional right-of-way is <br />required; 'proposals :Jior such acquisition. <br /> <br />G. <br /> <br />Estimated Costs <br /> <br />1. Costs of Construction <br /> <br />The chapter will include: <br /> <br />a. Derivation of unit construction costs and pertinent <br />factors affecting estimated construction costs. <br /> <br />b. A tabulation showing the quantities, unit cost, <br />and' total cost of each type of work or material <br />for ear.h major'structure and each class of minor <br />structures. ' <br /> <br />c. A summary of estimated project costs. <br /> <br />d, The allowance for contingencies that was included <br />in the cost estimate. <br /> <br />e. An allowance for future cost escalations that are <br />expected to occur between the date of the estimate <br />and the award of the construction contract. This <br />allowance will be specifically identified in the <br />cost summary as "Projected Price Increase." <br /> <br />f. The total project cost including an estimate of <br />the amount of interest during construction. <br /> <br />g. An estimate of other project costs will be con- <br />sidered, such as engineering, administration, <br />and the Owner's contribution. <br /> <br />2. Fund Requirement Schedule <br /> <br />The annual fund requirements by fiscal years for <br />each of the years of the construction period. <br /> <br />3, Operation, Maintenance and Replacement Costs <br /> <br />A tabulation of estimated future annual operation, <br />maintenance and replacement costs: for both "with project" <br />and "without project" conditions and a description of <br />their derivation, The tabulation will be made in bud- <br />get form, showing number or quantity and costs for per- <br />sonnel, material, supplies, equipment, and administration. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.