My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00200
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:43:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153372
Contractor Name
Hyannis Reservoir Company
Water District
0
County
Jackson
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I. <br />I <br /> <br />- <br />41 <br /> <br />I <br />I <br />, <br />I <br /> <br />. <br />. <br /> <br />J <br /> <br />A <br />, <br /> <br />. <br /> <br />II <br />I <br />I <br /> <br />. <br /> <br />3. <br /> <br />Minimum storage requirements will be based on the <br />longest period' that Iran reasonably be achieved tq <br />vide a more reliablel analysis of the recreational <br />fish and wildlife benefits. <br />II <br /> <br />pro- <br />or <br /> <br />\Vater Rights <br /> <br />An evaluation ol' Hyannis Reservoir Company water <br />rights, including priorities, projected and safe yields, <br />and transfer potential, and how these water rights af- <br />fect the availability of water for the proposed project, <br />as well as the North Platte River Litigation. <br /> <br />4. <br /> <br />\Vater Utilization <br /> <br />The projected amount of water:~hich will be avail- <br />able to the project will be develq:ped. This will in- <br />clude an operations study showing how new project <br />water will be utilized. <br /> <br />5. <br /> <br />vlater Quality <br /> <br />Analysis of the chemical and physical character- <br />istics of the project water in term~ of taste, color, <br />odor, biocides and other factors that might affect <br />crop production and fish habitat. ' <br /> <br />Included will be an estimate of sedimentation in <br />the proposed reservoir and any sPecial requirements <br />for selective withdrawal. },' <br /> <br />,.f, <br /> <br />F. Plan of Development <br /> <br />'" <br /> <br />" <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />.... <br /> <br />A <br /> <br />] <br />~ <br /> <br />~ <br /> <br />1 <br />'I. <br /> <br />1. Physical Plan <br /> <br />/ <br /> <br />The physical plans of the pr9Posed project will be <br />presented. This will include the various project <br />facilities and their purpose and, operation'. <br /> <br />2. <br /> <br />Geologic Investigations <br /> <br />A description of site and engineering geology for <br />the dam site, including maps of ~he surface geology and <br />a geologic cross-section based on surface geology. An <br />opinion will be given as to whether a more intensive <br />geologic examination, including on-site drilling, is <br />required. <br /> <br />3. Design <br /> <br />A description of criteria and standards used in <br />the design of the proposed structures, including the <br />following: <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.