My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00198
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:43:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153668
Contractor Name
Erie, Town of
Contract Type
Loan
Water District
0
County
Weld
Bill Number
SB 90-41
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'"'~ <br />, ".-"1 <br /> <br />writing from the SWSP Enterprise to ensure that such facillties do not <br />interfere With the hydraulic characteristics or operations of the Pipeline, <br />or otherwise potentially damage thE' Pipeline. Should the AlIottee's <br />generation of hydroelectric power or operation of any other facilities <br />which are hydraulically connected to the Pipeline interfere With the <br />intended operation of the Pipeline, Allottee shall cease operation of those <br />facillties upon receiving written notlfication of interference by the SWSP <br />EnterpriSe until modifications can be made to eliminate any interference, <br />Except as provided in paragraph 2.c. above. Allottee shall not construct <br />or install any modifications to facillties whiCh are hydraulically <br />connected to the Pipeline Without first obtaining prior technical approval <br />for such modlflcations in writing from the SWSP Enterprise to ensure <br />that such facilities do not interfere With the hydraulic characteristics or <br />operations of the Pipeline. or otherwise potentially damage the Pipeline. <br /> <br />5. Cost Allocation MethodololtV. All costs for planning. design. right-of-way <br />acquisition. construction. administration. operation. maintenance. repair and rehabilltation, of <br />the Pipeline will be divided into three categories: General Pipeline Costs. Individual Segment <br />Specific Costs and Non-Segment Specific Costs. <br /> <br />a. General Pipeline Costs will be those costs which cannot be specifically related <br />to an individual Segment and which shall be allocated based upon the <br />PartiCipants' percentages in Segment 01. as set forth on Schedule B. Such <br />costs will include. but not be llm1ted to. cost of preparation of the enviromnental <br />assessment for the Pipeline. <br /> <br />b. Individual Segment Specific Costs will be those costs which relate only to an <br />individual specific Segment of the Pipeline Including. but not limited to. costs <br />for right-of-way. the costs of deSigning, purchasing and installing the Pipeline <br />SCADA system and construction. There will be a Segment Specific Cost <br />category for each Segment of tlJ,e Pipeline. Individual Segment Specific Costs <br />will be allocated based upon e3.ch Participant's share of the capacity of the <br />Individual Segment allocated to all PartiCipants as set forth on Schedule B. <br /> <br />c. Non-Segment Specific Costs 'W1ll be those costs which relate to the Pipeline' <br />downstream of the Carter Lake Outlet Works Modlflcation but cannot be <br />specifically related to an Individual Segment. Non-Segment Specific Costs <br />include. but are not limited to. design. engineering and administration costs <br />and will be allocated to each Segment of the Pipeline based on the length of that <br />Segment as a proportion of the total length of the Pipeline downstream of the <br />Carter Lake Outlet Works Modification. The percentages established for the <br />sharing of these costs for each Segment are as set forth on Schedule B, <br /> <br />d. Allottee's Construction Costs shall be a collective reference to the amounts' <br />determined to be due hereunder from Allottee after calculating the AlIottee's <br />share of General Pipeline Costs. Individual Segment Specific Costs and Non- <br />Segment Specific Costs. minus pre-construction costs. as defined herein <br />(excluding any costs for operation and maintenance). <br /> <br />6. Charges and Costs. <br /> <br />a, Allottee has previously agreed to pay $143.700 as Its pro rata share of the <br />Pipeline pre-construction costs incurred for administration. prelimlnary and <br />final deSign. enviromnental evaluations and other necessary items. Of this <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.