My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00198
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:43:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153668
Contractor Name
Erie, Town of
Contract Type
Loan
Water District
0
County
Weld
Bill Number
SB 90-41
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,~--, <br />(~~_-":''YJ <br /> <br />" ~\ <br /> <br />h. The right of first refusal set forth above shall require SWSP Enterprtse to offer to <br />each of the Participants the opportunity to partiCipate In the construction of the <br />Increased capacity on terms and conditions substantially slIni1ar to all others <br />requesting to participate in such project. Allottee shall have sixty (60) days <br />from the receipt of the final terms and conditions of the participation to respond <br />in writing With regard to Its desire to participate, Allottee's right of first refusal <br />shall terminate only as to those contracts for Increased capacity which are <br />completed upon terms substantially similar to those offered to Allottee and to <br />which Allottee did not respond With Its desire to participate wtthin the slxty,day <br />period. Unless previously tenntnated pursuant to this paragraph. Allottee's <br />right of first refusal shall terminate on the last day of the 90th year after <br />execution of this Contract. <br /> <br />3. Use of Capacitv and Water. <br /> <br />a. Pipeline capacity allotted herein shall be used only for the transmission of: (I) <br />Dlstrtct water or Subdlstrtct water from Carter Lake ReseIVolr: (11) non-Dlstrtct <br />water or non,Subdlstrtct watef not delivered from Carter Lake ReseIVolr and <br />used by dJrect diversion. by ~change or otherwise. only Within the boundartes <br />of the Dlstrtct or the Subdlstrtct or any other property eligible for inclusion <br />Within the Dlstrtct or Subdistrict upon the inclusion thereof: (111) any other water <br />deliverable from Carter Lake ReseIVolr With the specific approval of the Board <br />and the approval of the Secretary of the Interior of the United States of America <br />or his designee (if Secretarial <lpproval is required by law or contract): or (Iv) any <br />other water With the specific approval of the Board: all for the use of Allottee. Its <br />water customers. or other Entities permitted hereunder. All water introduced <br />Into the Pipeline from sources other than Carter Lake Reservoir shall be of a <br />qualJty at least equal to that IJ:1 Carter Lake ReseIVolr at the time of the <br />Introduction of said water. <br /> <br />b. Water delivered through the Pipeline shall only be beneficially used. whether the <br />use Is by direct diversion. by exchange or otherw1se. in accordance With the <br />terms of this Contract: the Water ConseIVancy Act of Colorado. C.RS, l!l! 37-45- <br />101 et seQ" l!37-83-106; the rules. regulations and policies of the Board; and <br />the Colorado-Big Thompson Project Repayment Contract between the Dlstrtct <br />and the United States of America dated July 5. 1938. If applicable. or as <br />otherwise allowed With the Bo/lI'd's consent. <br /> <br />4. SWSP Enterprise Ownership. Operation and Maintenance. <br /> <br />a. The SWSP Enterprise shall own. construct. operate. maintain. replace and <br />repair the Pipeline. subject to t:be Allottee's perpetual. vested right to possession <br />of that portion of the capacity of the Pipeline allocated herein. To this end the <br />SWSP Enterprise shall be responsible for all planning. scheduling. right-of-way <br />acquisition. construction and engineering contracts relating to the Pipeline: any <br />required permits. Impact statements and other procedural or substantive . <br />matters necessary for completion of the Pipeline; and all operation. <br />maintenance, and replacement of the Pipeline. <br /> <br />b. The SWSP Enterprise covenants to prudently design. construct. operate. <br />maintain. repair and replace We Pipeline In good faith for the benefit of the <br />Allottee and the other PartiCipants. SWSP Enterprise acknowledges that Allottee <br />Is relying upon this covenant of SWSP Enterprise in executing this Contract and <br />in making payriJ.ent of all amOl.mts due hereunder. SWSP Enterprise and the, <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.