Laserfiche WebLink
<br /><~ <br />r. ." <br />"<. ~ <br /> <br />n. "Subdistrict" shall mean the Municipal Subdistrict. Northern Colorado Water <br />Conservancy District. a political subdMsion of the State of Colorado. and a body <br />corporate With all the powers of a public or municipal corporation. organized. <br />and existing by virtue of TItle 37. Article 45, Colorado Revised Statutes, as <br />amended. <br /> <br />o. "Subdistrict water" shall meaD the quantity of water acquired and obtained by <br />the Subdistrict from the development and construction of the Windy Gap Project <br />pursuant to applicable state lllW, and which is deliverable to Subdistrict <br />allottees. <br /> <br />2. Allocation of Caoacitv. <br /> <br />a. SWSP Enterprise covenants that Allottee shall have the perpetual, exclusive <br />right to use 1.03 million GPD of capacity In the Pipeline from Carter Lake to the <br />delivery point described in Schedule A attached hereto, upon completion of <br />construction thereof. Allottee's water Wi1J be delivered to Allottee by SWSP <br />Enterprise through the Pipeline at Allottee's request and on a year-round. <br />continuous basiS except for disruptions specifically permitted herein and <br />disruptions resulting from emergencies. Allottee shall not have the right to use <br />capacity In the Pipeline allotted to any other Participant Without the express <br />permission of the Participant whose capacity is being utilized. <br /> <br />b. SWSP Enterprise shall provide Allottee With eighty (80) days' prior written notice <br />of any scheduled disruption in the delivery rights of Allottee deSCribed herein. <br />Such eighty (80) day notice shall Include the date scheduled for Initiation and <br />termination of the disruption. Allottee shall respond within thirty (30) days of <br />receipt of the eighty (80) day notice and such thirty (30) day response notice <br />shall notify SWSP Enterprise as to whether the disruption is acceptable or <br />unacceptable. If the scheduled disruption is unacceptable. Allottee shall state <br />conditions under which the dlilruption would be acceptable to Allottee and <br />provide a Ininimum disruption of seven (7) consecutive days. SWSP Enterprise <br />shall not proceed In permitting the scheduled disruption unless and until issues <br />raised In the response notice bave been addressed to reasonably assure <br />unimpaired delivery to Allottee's serv1ce users. <br /> <br />c. Allottee's delivery pOint from tile Pipeline set out above and the Ininimum <br />hydraulic elevation at the delivery pOint described in Schedule B shall not be' <br />changed by the SWSP EnterpIise Without the written consent of Allottee. The <br />Allottee at its sole discretion may designate one or more alternate points for <br />delivery from its delivery point described In Schedule A to another point <br />upstream on the Pipeline Without the consent of SWSP Enterprise so long as the <br />change redesignation does not adversely affect the hydraulic characteristics or <br />operation of the Pipeline; provided. however. Allottee shall pay all costs of <br />design, engineering, construction and administration of changing its delivery <br />polnt(s). <br /> <br />d. In the event that the Pipeline. after completion of construction, has capacity <br />downstream of the Carter Lake Outlet Works Modification In excess of the <br />Initially allocated capacity ("ElCcess Capacity"), Allottee shall have the perpetual. <br />exclusive right to use a pro rata share of the Excess Capacity at Allottee's point <br />of delivery. The Allottee's pro rata share of the Excess Capacity shall be the <br />Allottee's percentage of the total Individual Segment Specific Costs and Non- <br />Segment Specific Costs of the Pipeline for all Segments downstream of the <br />Carter Lake Outlet Works Modification. In addition, if Allottee is entitled to a <br /> <br />3 <br />