My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153167 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153167 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:42 PM
Creation date
10/5/2006 11:43:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153167
Contractor Name
Dove Creek, Town of
Contract Type
Loan
Water District
32
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Town of Dove Creek <br /> <br />Dove Creek water use during the last three years has varied <br /> <br />from an average monthly use of 2,000,000 gallons per month to <br /> <br />4,000,000 gallons, with the peak monthly use being 6,064,000 gallons. <br /> <br />No daily records are available, however, the maximum well <br /> <br /> <br />pump capacity is 345,600 gallons per day. The daily average based on <br /> <br /> <br />the maximum month Was 202,130 gallons and the average annual daily <br /> <br /> <br />use has varied from 66,700 to 133,300 gallons. <br /> <br />If adequate water was available so that restrictions did <br /> <br />not have to be imposed each year, the annual and daily average <br /> <br />would undoubtedly increase. <br /> <br />Assuming adequate water <br /> <br />annual use would immediately <br /> <br />while the average daily use <br /> <br />approximately 300,000 gallons <br />would be influenced more by <br /> <br />of the water. <br /> <br />was available, the average daily <br /> <br />increase to 150,000 gallons per day <br /> <br />based on the peak month would be <br /> <br />per day. Thereafter the increases <br /> <br />growth of the area and the cost <br /> <br />Rural Area Between Dove Creek and Cahone <br /> <br />This rural area has 55 houses which are not served by a <br /> <br />These taps <br /> <br />month per <br /> <br />pipeline system. <br />5,000 gallons per <br />gallons per day. <br /> <br />would <br /> <br />an average tap usage of <br /> <br />have <br /> <br />tap, <br /> <br />system average of 9,000 <br /> <br />or <br /> <br />a <br /> <br />IV - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.