My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00195
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:43:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153329
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 80-67
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Fnrm 6.AC.02A <br /> <br /> <br />$ 985,000 <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made this----...!..2..tl.:Lday of_f?~..Etember <br />State of Colorado for tbe use and benefit of the Department of "1 N:'lrnr:'ll <br /> <br />19 J3..Q by and between the <br />RI">~nllY'{,l">q (('nlnY'Ailn <br /> <br />~""or f'nnQArUAt-inn ROArill <br /> <br />hereinafter referred to as the State, and "2; HI-I"> Wi'ltl">r rnnl":pn1Anr:y nil'ltrir.t- P 0 Rnx ann <br />r....::""A lnn.....t-inn ('nl.....r;::onn s:ll t:lOl <br />hereinafter referred to as the 'contractor, <br /> <br />WHEREAS, authority exi~ in the Law and Funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencum'~red balance thereof remains available for &ayment in Fund Number AnnA <br />G/L Account Number~l117 ,Conhact Encumbrance NumberC./<.ot)"":g:3.;lr and <br /> <br />WHEREAS, required approval, clearance and coordination has been accomplished from and with appropriate <br />il!:\cncil's; lll1d <br /> <br />WHEREAS. "3 pursuant to the prov~s~ons of 37-60-119, Colorado Revised Stat- <br />utes 1973, as amended, the state is authorized to construct certain water projects <br />for the benefit of the people of the State; and <br /> <br />WHEREAS, the Contractor is a Water Conservancy District in the state of Colo- <br />rado and wishes to undertake construction of a water tank and main pipeline here- <br />inafter called the project for the members of the Ute Water Conservancy District <br />in Mesa County, Colorado, at an estimated cost of about Thirteen Million Dollars <br />($13,000,000); and <br /> <br />WHEREAS, a feasibility investigation of said project was conducted and it was <br />found that such a project is economically feasible; and <br /> <br />WHEREAS, the State has agreed to construct part of said project and to sell <br />the same to the Contractor upon mutually agreeable terms and conditions, subject <br />to the approval of appropriations for that purpose by the Colorado General Assembly <br />and the Governor of the State of Colorado; and <br /> <br />WHEREAS, pursuant to Senate Bill No. 67, Fifty-Second General Assembly of the <br />State of Colorado, duly enacted by the Colorado General Assembly and approved by <br />the Governor of the State of COlorado, there was appropriated to the State the <br />sum of One Million Dollars ($1,000,000) for construction of part of the Project; <br />and <br /> <br />WHEREAS, the Contractor has available from its own sources and from other <br />sources sufficient funds to construct the remainder of the project; <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent covenants herein <br />contained, it is agreed by the parties as follows: <br /> <br />A" The Contractor agrees that it will: <br /> <br />1. Cause the construction of said proje~t to be completed within two (2) <br />years of the date of this contract in accordance with the project plans and <br />specifications and any necessary modification thereof approved by the state. <br />No payment will be made under this contract until the project plans and specifi- <br />cations are approved by the State. The" above mentioned time may be extended <br />by the State if such time is insufficient. because of acts of God or other acts <br />or circumstances beyond the control of the Contractor. <br /> <br />2. Conveyor cause title to be conveyed by deed or other proper conveyance <br />to the State, the following portions of the proposed project fac:i.litie5: <br /> <br />(a) A five million gallon water tank with all appurtenances to be located <br />within 4.839 acres of land, as described in Appendix A. <br /> <br />(b) 4.839 acres of land as described in Appendix A. <br /> <br />3. Permit periodic inspection of construction by the authorized representa- <br />tives of the State during construction and permit the State to review and approve <br />or disapprove any contracts for the construction of the project or the performance <br />of work pursuant to such contracts or subcontracts. <br /> <br />4. <br />system <br /> <br />without expense to the State, manage, operate, and maintain the project <br />continously in an efficient and econ~mical manner, and assume all legal <br />.(See instructions on reverse of last page.) <br /> <br />Page -1- of ~ pages <br /> <br />! <br />
The URL can be used to link to this page
Your browser does not support the video tag.