My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00189
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:52 AM
Creation date
10/5/2006 11:42:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153357
Contractor Name
Henrylyn Irrigation District
Contract Type
Loan
Water District
1
County
Weld
Bill Number
EO 05-28-81
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />._\ <br /> <br />SCHEDULE A <br /> <br />COI.OIlAIlO WAHIl CONSFIIVM ION I\OAIlIl <br />CUNSlllUC r IUN mNU !'1l0GIlAM !'llllCLIlLJIlLS <br /> <br />1. Board approval of enqlneerinq firm dnd enqineerinq <br />agreement between engIneering fIrm and project sponsor. <br /> <br />2. Prcf..ldrcJllon or dcl.lilcd pldll!.> ,)rld spccificdliollS for <br />authorIzed projects by consulting engIneerinQ firm. <br /> <br />3. Approval of detdIled plans and specifications by Board <br />staff (plans and specificallons for storaqe ddms dnd <br />reservoIrs must dlso be approved by State Enqlneer's <br />offIce). <br /> <br />4. BOdrd staff approval of biddinq for the project. Boord <br />staff present at bId opening for construction. <br /> <br />5. Project sponsor may Issue the notice of award and the <br />notice to proceed with construction to the contrdctor <br />(both notices mus~ be approved by the Board staff before <br />they are issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br />constructIon schedule hy BOdrd staff. <br /> <br />7. Construction commences. The Board staff makes periodic <br />inspectIons durIng construction. All chdnge orders must <br />be approved by the Board staff In advance and before dny <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />8. The consultinq engineer certifies that the project hds <br />been completed accordIng to approved drawIngs and <br />specifications and arranqes for final inspection. <br /> <br />9. Flndl inspectIon and dcceptdflce of ds-built project hy <br />Board staff. <br /> <br />10. Submittal of as-built drawings to Aoard staff for <br />app rova I and fill nq. <br />
The URL can be used to link to this page
Your browser does not support the video tag.