Laserfiche WebLink
<br />2. Conveyor cause title to be conveyed by deed or othe~ proper <br />conveyance to the Colorado Water Conservatio~ Board, Department of <br />Natural Pesourc€:s, State of Colorado, the fol-lowing portions. of the <br />proposed project facilities: <br /> <br />a. A 12,030 foot concrete-lined section, having an average <br />bottom width of 4 feet, of the Sangre de Cristo-Trinchera <br />Diversion Canal, with all necessary appurtenances. <br /> <br />b. A 5,940 "foot concrete-lined section, having an average <br />bottom width of "1 foot, of the Labato Lateral and th~ Labato" <br />Extansion, with all necessary appurtenances. <br /> <br />c."" A 1,104 foot concrete-"lined section, having an average <br />bottom width of 1 foot, of the Whitehead-Escheman Lateral, <br />with all necessary appurtenances. <br /> <br />d. A 6,600 foot concrete-lined section, having an average <br />bottom width- of 2 feet, of the Bean Lateral and the Middle <br />Bean Later~l, with all necessary appurten~nces. <br /> <br />e. An 8,077 foot concrete-lined section, having an average <br />bottom width of 2 feet, of the Newton Canal, with all necessary <br />appurtenances. <br /> <br />f. A 2,648 foot concrete-lined section, having an average <br />bottom width of 1.5 feet, of the GrimWOOd-Smith Latera~, \lith <br />all necessary appurtenances. <br /> <br />g. A 2,931 foot concrete-lined section, having an' average <br />bottom width of 2.5 feet, of the Garland Canal, with all <br />necessary appurtenances. (The approximate locations of the <br />above are shown on Appendix A.) <br /> <br />3. Permit periOdic inspection of construction by the ~uthorized <br />representatives of the state during construction a~d permit the state <br />to review and apprOve Or disapprove any contracts for the construction <br />of the project or the performance of work pursuant to such contracts" <br />Or subcontracts. <br /> <br />4. Without expense to the state, manage, operate, and maintain <br />the project system continuously in an efficient and economical manner, <br />and aSSUme all legal liability for such management, operation, and <br />maintenance. <br /> <br />5. Make the services of said project available within its capacit'l <br />to all persons in the Contractor's service a~ea without discrimination:- <br />as to race, colori religion, Or natural origin at reasonable charges, <br />including assessments, taxes,'or fees in accordance with a schedule <br />of such charges, whether for one Or more classes of service, formally <br />adopted"by the contractor through its board of directors, as may be <br />modified from time to time by the Contractor. The initial rate <br />schedule must be approved by the state. Thereafter, the contractor <br />may make such modifications to the rate schedule as the contractor <br />d~ems necessary to efficiently and economically provide for the finan- <br />cial requirements of the system as long as the rate schedule remains <br />reasonable and non~discriminatory, and subject to the approval by the <br />state. <br /> <br />6. Adjust its operating costs and service charges from time to <br />time to provide for adequate operation and maintenance, emergency <br />repair services, obsolescence reserves, debt service, and debt <br />reserves. <br /> <br />7,. Expand the system from time to time to meet reasonable growth ": <br />or service requirements in the area within its jurisdiction. <br /> <br />8. Provide the state with such periOdic ~eports as it may requirg <br />and permit periOdic inspections of its operations and accounts by a <br />designated representative of the State. The ColoradO Water Conserva- <br />tion Board, its agents, and employees, is hereby designated as the <br />agent of the State for the purposes of this contract. <br /> <br />Page 2 of 5 pages <br />