My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00186
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2010 3:17:51 PM
Creation date
10/5/2006 11:42:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153170
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Bill Number
SB 77-35
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />THE TRlcHERA IRRIGA nON CJPANY <br /> <br />P. O. BOX 41 <br /> <br />BLANCA, COLORADO 81123 <br /> <br />\ <br /> <br />August 7, 1979 <br /> <br />f!!1I&Jilf1frp <br />{4(]G ,f$;J77r <br />, 09 !.'o 'Ill <br />;' oilS <br />co'^' '-'-< <br />'vSf:' <br />RVAr, , j <br />IVN <br />SOARD <br /> <br />Colorado Water Conservation Board <br />Nick Ioannides <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br /> <br />Dear Mr. Ioannides: <br /> <br />Due to an unusually good water year which has developed into <br />very good stream flows and storage, it became apparent that full <br />use of the water would possibly be more prectical this year, <br />without putting restrictions on certain users, which would be <br />necessary in the construction of the ditches in Phase IV of the <br />Trinchera Watershed Project. <br /> <br />Also, due to the escalating costs of construction, it became <br />quite evident that additional funding would be necessary to <br />continue the project to completion. Our loan committment from <br />your agency is adequate if we can find additional funds to cut <br />our ratio from 50 percent to 20 percent participating funds. The <br />various agencies have been and are being approached at this time. <br /> <br />With these two very important factors in mind, we have chosen to <br />defer construction for this year. If there should be a change in <br />funding later and time left for construction, it is conceivable <br />that some work could be done on a small basis, but at this point, <br />it doesn't look too good. <br /> <br />We are aware that payment is due this year and would like to <br />know if that payment will be based on the entire loan or on the <br />portion that we have used. <br /> <br />Best personal regards. <br /> <br />Sincerely, <br /> <br />~-U. <br /> <br />t(, ~-/ <br /> <br />W. A. Kester, <br />President <br /> <br />WAK:cjs <br />
The URL can be used to link to this page
Your browser does not support the video tag.