Laserfiche WebLink
<br />",'., <br /> <br />Fmm f,.A(".1l1A <br /> <br />i::' <br />W" <br /> <br />(;) !k ,/?S' (OCJ3> <br />I)EI~MENT OR AGENCY NUMB "R <br />34-04-00 <br /> <br /> <br />CONTR^C~ <br /> <br />THIS CONTRACT. made this 1st day of July <br />Stale of Color:]{lo for the Ilse and benefit of the Deparlment of'l Natural <br />(Colorado Water Conservation Board, <br />hereinafter r('ferred 10 as the Slalf', and "2 the Town of Basalt, <br />P.O. Box Q, Basalt, CO 81621 <br />hl'reinahcr fr[erred to as Ihe contractor, <br /> <br />(\f221,106.83 <br />'t 84 ' <br />19 'by and between the <br />Resources <br /> <br />WHEREAS. lwthor;ly l'xisb in the Law and Funds huve been btldgel~d, appropriated and olher"\,,>sl;.Il"d' <br />aVllilablc and a ~\lHici('nl unencumbered balance thereof remains :wailahle for payment in Fund Number 4Bu <br />G/l AcCount Numher 5767X" Conlmct Encumbrance Number C153416. and ' <br />ABL Account Number 17672, Org. Unit 77-77-117, <br /> <br />. WIIEREAS. rl'quired al1rro~al, dear,lIlee and coordination ha,s bee I) accomplished from and with appropriate <br />aitencil's: :Iud <br /> <br />WHEREAS, pursuant to the provisions of 37-60-119, Colorado <br />Revised Statutes 1973, as amended, the State is authorized to <br />construct certain water projects for the henefit of the people <br />of the State; and <br /> <br />WHEREAS, the Contractor is a duly constituted town in the <br />State of Colorado and wishes to improve its existing water <br />supply system, hereinafter called the project, for the citizens <br />of the Town of Basalt in Eagle County, Colorado, at an <br />estimated cost of Three Hundred Fifteen Thousand Dollars <br />($315,000); and <br /> <br />WHEREAS, a feasibility investigation of said project was <br />conducted and it was found that such a project is economically <br />feasible; and <br /> <br />WHEREAS, the State has agreed to construct said project and <br />to sell the same to the Contractor upon mutually agreeable <br />terms and conditions, subject to the availability of funding <br />for that purpose~ and <br /> <br />WHEREAS, pursuant to Senate Bill No. 69, Fifty-First <br />General Assembly of the State of Colorado, duly enacted into <br />law, the Colorado Water Conservation Board has been authorized <br />to ~xpend a sum not to exceed six Hundred Thousand Dollars <br />($600,000) for construction of the project; <br /> <br />NOW THEREFORE, in consideration of the mutual and <br />dependent covenants herein contained, it is agreed by the <br />parties hereto as follows: <br /> <br />A. The Contractor agrees that it shall: <br /> <br />1. Employ an engineering firm to prepare project plans <br />and specifications for the proposed project. Both the <br />engineering firm and the prpject plans and specifications shall <br />be approved by the State. <br /> <br />2. Subcontract the construction of said project to a <br />responsible and capable firm, said project to be completed <br />within two (2) years of the date of this contract in accordance <br />with the project plans and specifications and any necessary <br />modification thereof approved by the State. The State must <br />approve, in writing, all subcontracts before they become <br />effective. The above-mentioned time may be extended by the <br />State if such time is insufficient because of acts of God or <br />other acts or circumstances beyond the control of the <br />Contractor. <br /> <br />3. Require all Subcontractors to indemnify the State and <br />the Contractor against all liability and loss, and against all <br />claims and actions based upon or arising out of damage or <br />injury, including death. to persons or property caused by or <br /> <br />395-5)()1-1014 <br /> <br />. . Pane I !If -1- pages <br />IS.,c onshu."'IOn"Un 'cv.."scurl~M page,) <br /> <br />il.Q~alt <br />