My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00180
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2011 2:20:47 PM
Creation date
10/5/2006 11:42:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153639L
Contractor Name
New Cache La Poudre Irrigating Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 93-1273
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The condition with ice is believed to be somewhat conservative as the Poudre River is <br />normally very low throughout the winter. It is doubtful that the ice thickness would develop <br />to produce a load of 10,000 pounds per linear foot as is typically used on dams. <br /> <br />An analysis of the pier to base slab joint was also conducted to determine the potential for <br />movement of the piers under the NORMAL LOADING CONDITION indicated above. The <br />analysis was based on a sliding friction type of analysis rather than the concrete shear strength <br />concept due to the erosion of the joints. Based on this analysis and assuming 25 percent loss <br />of contact at the joints, the factor of safety against sliding was determined to be 1.25. Of <br />course, there is more than just friction holding the pier to the apron. Therefore, the factor of <br />safety is conservative. For concrete dams, a factor of safety of 3.0 would be required for <br />sliding between components. <br /> <br />Based on our analysis, it would appear the SU1lcture is stable under most conditions. This <br />analysis, however, is based on various assumptions; and more specific physical information <br />would be required to conduct a more in-depth analysis of the structure. The concrete strength <br />and whether the piers make good contact with the base slab and whether the base makes good <br />contact with the rock foundation would have to be determined to make a final prediction of <br />the structure's stability. There are areas where the concrete is deteriorated and does not meet <br />the strength criteria used in the analysis . We know the concrete to rock interface is lacking in <br />some areas. These items would have to be addressed and repaired to ensure the long-term <br />stability of the structure. <br /> <br />2. Proposed New Structure - Stability. One alternative examined as outlined in Section A.S <br />below is to replace the existing structure wim a new structure. This structure would be <br />composed of a concrete base slab and seepage cutoff, an overflow wall section, and a control <br />gate in the same area as the existing sand gate. This alternative is described more thoroughly <br />below in Section A.S. <br /> <br />The stability of this section was determined using the same conditions as outlined above for <br />the existing structure: USUAL, UNUSUAL, arid EXTREME. <br /> <br />PAGE8.CbapcerV <br />
The URL can be used to link to this page
Your browser does not support the video tag.