Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />A.2. GEOTECHNICAL INVESTIGATIONS <br /> <br />The geotechnical investigations are described in Appendix E. These investigations were <br />conducted in March 1993 by SMITH GEOTECHNICAL/Engineering Consultants. The plan <br />of development of a new structure is based on this data. If, in the final analysis, the Owner <br />decides to repair the structure, additional subsurface drilling, coring, and testing the concrete <br />in the structure will be required. <br /> <br />This investigation was limited to a visual inspection of the structure and drilling two (2) test <br />borings at each end of the structure. Strength testing was not conducted on the existing <br />structure concrete or the soils and rock encountered in the borings. <br /> <br />A.3. SOIL AND ROCK DESCRIPTION <br /> <br />1. Subsurface Soils. The overburden soils at the dam sites consist of sands, gravels, and <br />some cobbles. Shale was encountered in the borings at a depth of eleven feet (11') to thirteen <br />feet (13') below grade. <br /> <br />The predominant soil type encountered in the overburden was fme to medium silty sand. This <br />material ranged from loose to medium dense with SPT blow counts from 3 to 13 blows per <br />foot, and the moisture ranged from damp to saturated. <br /> <br />Some cobbles were encountered in the overburden but did not appear to be predominant and <br />were estimated to be in the three inch (3") to six inch (6") size. This would not expect to be <br />typical along the Poudre River. To the contrary, it is typical to fmd cobbles of this size and <br />larger more predominantly. This lack of cobble in the abutment fIll may be due to the <br />possibility that imported fill may have been placed when the structure was constructed. <br /> <br />2. Rock. Shale bedrock underlies the overburden soils. The rock is weathered for the fIrst <br />few feet and becomes less weathered with depth. The bedding varies from no noticeable <br />bedding structure to being fissile with easily distinguishable bedding planes. The bond <br />between the bedding planes is not highly cemented, and excavation of the material should be <br />able to be accomplished without blasting. <br /> <br />3. Groundwater. The groundwater depths were measured in the boreholes immediately after <br />drilling and found to be at depths from eight feet (8') to nine and one half feet (9.5') below <br />grade. This depth is approximately two feet (2') above the river water level at the time of <br />measuring. <br /> <br />4. Borrow Materials. There are no sources of borrow materials at the immediate structure <br />site. All earth borrow materials and all rip rap and bedding materials will be hauled to the site <br />from other sources. No large quantities of earth fill materials are required for the project as <br />the only need will be to rebuild and expand the abutment areas. <br /> <br />PAGE4 . CbaptcrV <br />