My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00178
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:10 AM
Creation date
10/5/2006 11:42:09 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153506
Contractor Name
Huerfano-Cucharas Irrigation Company
Water District
0
County
Las Animas
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTACHMENT A <br /> <br />. <br /> <br />.' <br /> <br />. <br /> <br /><P <br /> <br />P~II'lCIP"'1..S <br />~ON"'LO C. HIFlSCi"lFELO. "'E. <br />STEVE..J. !'>OULOS, P 10:. <br />OANIEL. P LAc;....rr.... FIE. <br />.QICH...",O F' ,",UPOOCI(. P E. <br />GONZALO C,.t.$TAO. P E. <br />"ssaCI"'T~ <br />"'OI'<N w .'lANCE.. I"E. <br /> <br />~:~U~~:C::Er::~L;~'~ 202~:::~~~c~e:~3~3J'~~1 <br /> <br />II rt It # Ii); <br />SCP J ff t liP <br />" CaLc:" 0 1981 <br />C'I';V~..... 'IrlDo . <br />'--":", I" <br />....'(v~r .,.:'--.... <br />Ie:! /. .~.'.....- <br /> <br />September 30, 1987 <br />P2371 <br /> <br />" <br /> <br />Mr. John Horton, President <br />Huerfano-Cucharas Irrigation Company <br />4338 40th Lane <br />Avondale, CO 81022 <br /> <br />SUBJECT: Revised Proposal to Complete Feasibility Study of <br />Cucharas No. 5 Dam and Reservoir According to <br />Colorado Water Conservation Board (CWCB) Requirements <br /> <br />Dear John: <br /> <br />The following proposal outlines the scope of work and esti- <br />mated cost to complete a feasibility level study of modifications <br />to the Cucharas No. 5 dam and reservoir in accordance with ewCB <br />feasibility study requirements. This proposal has been revised <br />based on comments received from the ewCB on our original proposal <br />dated September 18, 1987. <br /> <br />Scope of Work <br /> <br />The work we propose to complete would consist of work items <br />outlined below which are in accordance with the "Guidelines For <br />Preparation of Feasibility Reports. by the ewCB. Note that the <br />work under Items 5 and 6 includes both the Phase II and Phase III <br />engineering evaluations as originally proposed in our letter of <br />May 22, 1987. The discussion below expands upon the Phase II and <br />Phase III evaluations described in our previous letter. All <br />other work items are necessary to comply with the feasibility <br />study and reporting requirements of the ewCB. <br /> <br />Work Item <br /> <br />Description <br /> <br />ewCB Chapter No. <br /> <br />No.1 <br />No.2 <br />No.3 <br />No.4 <br />No.5 <br />No. 6 <br />No.1 <br />No.8 <br />No.9 <br /> <br />General Information <br />The Irrigation Company <br />Land <br />Water <br />Plan of Development <br />Estimated Costs <br />Project Evaluation <br />Financial program <br />Feasibility Study Report <br /> <br />I <br />II <br />III <br />IV <br />V <br />VI <br />VII <br />VIII <br /> <br />ATTACHMENT A <br /> <br />OiHER OFFICe:S: BOSTON. MASSACHUSETTS + CONCORD. NEW HAMPSHIRE <br />
The URL can be used to link to this page
Your browser does not support the video tag.