My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00178
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:10 AM
Creation date
10/5/2006 11:42:09 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153506
Contractor Name
Huerfano-Cucharas Irrigation Company
Water District
0
County
Las Animas
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br /> <br />CQNTR^CT ROUTING NUMBER <br />5 <br /> <br />Fdm 6-AC.oZA (R SI8S) <br />WPB <br /> <br />1..-: <br /> <br />-'. <br /> <br /> <br />~~ FEASIBILITY REPORT <br />~" CONTRACT <br /> <br />-, ~~ RACT. m,d, 'hi'---;/~d'Y of '7?~d <br />d Colorado (or lhe use and henent of tne lkl'arlmenl uf 'I Natural <br />ter onservation Board), <br />hereinafter rderred 10 as the Slalt', and '2 --The Huerfano-Cucharas <br />c.ompanv. P. O. Box 35. Pueblo. CO 81002. <br />hrreinartcr referred 10 as the contractor /Contractor. <br /> <br />$19,000 <br /> <br />Irriqation <br /> <br />f{f;'~1 <br />\\ ,~ <br /> <br />198 !Z. . by and between the <br />Resources <br /> <br />WHEREAS. Huthority exists in the Law and Funds have been budgeted, appropriated and otherwise made <br />available Olnd a sufficient unencumbered ba1311cc thereof remains 3Ji1ilable for payment in Fund Number 4008 <br />G/L AC((lUnl Number 5293X. (onlral'! Encnmbr:lIIce Numbed '(,']3!i:Jc,. and <br />ABL Account Number l2930, Org. Unit 77-77-777, <br />WUEREAS. re1luircd approval. dCluam:c and coordination hll~ been accomlllished horn and wilh al'prol'riate <br />agencies: and <br /> <br />WHEREAS. pursuant to the provisions of section 37-60-119. <br />Colorado Revised Statutes. as amended. the State is authorized <br />to construct certain water projects for the benefit of the <br />people of the State of Colorado; and <br /> <br />WHERBAS. the irrigation company has made application to the <br />State for the improvement of its existing facility. such <br />improvement of the facility is hereinafter sometimes referred <br />to as the project; and <br /> <br />WHEREAS. the Contractor is an irrigation company within the <br />State of Colorado: <br /> <br />NOW THEREFORE, it is hereby agreed that: <br /> <br />1. The Contractor shall have a feasibility report prepared <br />and directed to the problem of improving the fa~ilities of the <br />Cucllaras No.5 Dam and Reservoir in accordance with a proposal <br />for a project feasibility report prepared by the consulting <br />engineerirlg firm of Geotechnical Engineers Inc. (the <br />Consultant) and approved by the State. received September 30. <br />1987. which proposal is attached hereto as Exhibit A and made a <br />part of this contract. <br /> <br />2. Ten (10) copies of the final report called for in this <br />contract shall be furnished to the State not later than <br />sixty (60) days after the date of this contract. unless such <br />time is extended by mutual agreement of the parties hereto in <br />writing. <br /> <br />3. As compensation for the services of the Contractor. the <br />State shall pay to the Contractor the sum of Nineteen Thousand <br />Dollars ($19.000) in the manner fOllowing: <br /> <br />a. Sixty peccent (60\). to wit. Eleven Thousand Four <br />Hundred Dollars ($11,400) of the total amount due in two <br />(2) mOllthly illstallments of Five Thousand Seven Hundred <br />Dollars ($5.700) each. commencing twenty (20) days after <br />the date of this contract. <br /> <br />b. The remaining forty percent (40\). to wit. Seven <br />Thousand six Hundred Dollars ($7,600) within forty (40) <br />days fOllowing receipt and acceptance of the written report <br />specified in paragraph 2. of this contract. <br /> <br />4. The total cost of services to be rendered for the <br />Contractor by the Consultant is Thirty-Eight Thousand Dollars <br />($38.000) and the Contractor shall pay the sum of Nineteen <br />Thousand Dollars ($l9,OOO) as agreed to by letter dated October <br />6. 1987. which is hereby attached and made a part of this <br />contract as Exhibit B; and in no event shall this payment be <br />the liability of the State of Colorado. <br /> <br />395-5J{)1-1OH <br /> <br />4 <br />P:Jl!c I of_pages <br />.fS~c instr\ll'li"n~ un rc~criiC ur hl~t page.) <br /> <br />4993E <br />
The URL can be used to link to this page
Your browser does not support the video tag.