My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153833 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153833 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:29:06 AM
Creation date
10/5/2006 11:41:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153833
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SUMMARY OF PROPOSED PROJECTS <br />NORTH POUDRE IRRIGATION COMPANY <br />RESERVOIRS NOS. 4, 5 AND 6 AND INDIAN CREEK RESERVOIR <br /> <br />Project Sponsor: North Poudre Irrigation Company <br /> <br />Type of Project: Agricultural and municipal - dam, spillway and ditch rehabilitation. <br /> <br />Location: About 5 to 10 miles north of Fort CoIlins in Larimer County as shown on the <br />attached map. <br /> <br />Date of Application: Originally, November 20, 1997 <br /> <br />Feasibility Study: Draft received November 2,1998, revised January 19, 1999- <br />prepared by Smith Geotechnical <br /> <br />'e. ,- <br /> <br />Project Description: The North Poudre Irrigation Company (NPIC) is proposing four <br />rehabilitation projects involving three of its reservoirs and an outlet ditch from a fourth <br />reservoir. Three of the projects, NPIC Reservoirs Nos. 4 and 5 and Indian Creek <br />Reservoir, involve spillway improvements as well as other construction to meet the <br />requirements of the State Engineer's Office and to generally improve the safety of these <br />structures. The fourth project, NPIC Reservoir No.6 Outlet Ditch, involves installing <br />reinforced concrete pipe in an existing ditch alignment to prevent further erosion and <br />sloughing of ditch embankments and resultant damage to nearby lands. <br /> <br />Estimated Proiect Cost: $1,896,960 allocated as follows: <br /> <br />Reservoir No.4 $488,462 <br />Reservoir No.5 $200,375 <br />Indian Creek Reservoir $585,340 <br />Reservoir No.6 Outlet Ditch $622,783 <br />Total $1,896,960 <br /> <br />Requested Loan: In January 1998, the Board gave conditional approval for a $500,000 <br />Construction Fund loan for a portion of the above at 75 percent of project costs; One of <br />the Gonditions of loan approval was the completion of a feasibility study. The NPIC is <br />now requesting an additional $1,107,000 which represents 90 percent of the additional <br />costs, The Company is requesting a 20-year loan term with a weighted lending rate of <br />4.04 percent based on the distribution of shares in agricultural and municipal water use. <br />
The URL can be used to link to this page
Your browser does not support the video tag.