My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153833 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153833 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:29:06 AM
Creation date
10/5/2006 11:41:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153833
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />$1,107,000_ The Company will fmance its share of project costs through rate increases <br />and a short-term commercial bank loan, if necessary. <br /> <br />The recommended lending rate for the $1,107,000 is 4.04 percent based ona weighted <br />average for the middle income municipal rate of 4.50 percent and the agricultural rate of <br />3.50 percent for 20 years. The lending rate for the $500,000 is 4.28 percent as set at the <br />January 1998 Board meeting, . <br /> <br />Thirty-six year financial proj ections included in the feasibility study indicate that <br />assessments will increase from the current level of $85 per share to $115 per share in <br />2000 and then gradually decrease over the next 35 years, <br /> <br />The only alternative source of funding for this project would likely be a commercial bank <br />loan involving a lending rate of about eight percent and a loan term of much less than 30 <br />years. <br /> <br />Economic Analysis <br /> <br />The economic analysis in the feasibility report indicates that the annual cost of the four <br />projects amounts to about $8 per acre-foot, assuming an average annual yield of 17,000 <br />acre-feet. Benefit/cost ratios were calculated separately for all four projects and all but <br />one project displayed a B/C ratio greater than 1.0. <br /> <br />Collateral <br /> <br />As security for the loan, the Company will offer a pledge of revenues from assessments <br />and a security interest in lands, storage sites and water rights at least equivalent in value <br />to the principal amount of both loans. In addition, the staff will continue discussions with <br />the borrower to amend four of the existing loan contracts in order to provide for suitable <br />collateral, as described above. <br /> <br />Conclusion <br /> <br />Staffhas not yet the opportunity to review the revised feasibility study in sufficient detail <br />to make a final determination of feasibility and will therefore request a conditional loan <br />approval for this application. <br /> <br />Recommendation hot /'9 .e.~ 400;1 /- hid. e0;'C~ <br /> <br />Staff recommends that the ~d recommend to the General Assembly a Construction <br />Fund loan of$I,107,0001:~:~orth Poudre Irrigation Company (NPIC) of Wellington <br />for the rehabilitation of those portions of the Company's water supply system as <br />described in this memorandum, The recommended lending rate is 4.04 percent for a term <br />of 20 years, Staff further recommends that the Board require, prior to execution of a loan <br />contract, that: <br /> <br />5 <br /> <br />~Od -'I a01tA- f <br />
The URL can be used to link to this page
Your browser does not support the video tag.