My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153833 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153833 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:29:06 AM
Creation date
10/5/2006 11:41:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153833
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORl\DO <br /> <br />- <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (3031 866-3441 <br />FAX: (3031 866-4474 <br /> <br />MEMORANDUM <br /> <br />TO: Colorado Water Conservation Board Members <br /> <br />FROM: Bill Stanton, P.E., Chief, Project Planning and Construction Section <br />Bill Green, P.E., Manager OfPlanning~f- <br /> <br />DATE: January 26, 1999 <br /> <br />SUBJECT: Agenda Item 12b., January 27-28, 1999 Board Meeting- <br />Water Project Construction Loan Program - Changes in Existing <br />Loans - North Poudre Irrigation Company - System Rehabilitation <br /> <br />, <br />.j <br /> <br />Introduction <br /> <br />The Board will be asked to provide conditional approval for a Construction Fund loan of <br />$1,107,000 to the North Poudre Irrigation Company (NPIC) of Wellington for several <br />;ater system rehabilitation projects. Please see the attached project summary and map, <br /> <br />Backeround <br /> <br />In January 1998, the Board gave conditional approval for a $500,000 Construction Fund <br />loan (subsequently authorized in HB98-1189) which represented 75 percent of the <br />estimated costs for three rehabilitation projects involving NPIC Reservoirs No, 5 and 6 <br />and North Poudre's Buckeye Lateral. The Buckeye Lateral project has since been <br />cancelled. The Company would still like to pursue the two remaining projects as well as <br />two other rehabilitation projects for NPIC Reservoir No.4 and the Company's Indian <br />Creek Reservoir. <br /> <br />One of the conditions ofloan approval in 1998 was the completion of a feasibility study. <br />The Company has submitted a feasibility study by Smith Geotechnical of Fort Collins. <br />The Study defines all four projects and provides economic, financial and technical <br />analyses of each. Staff is still in the process of reviewing the revised version of the study, <br />which was submitted on January 19, 1999. <br /> <br />Bill Owens <br />Governor <br /> <br />Greg a Walcher <br />Executive Director, DNR I <br /> <br />Peter H. Evans <br />Acting Director, ewes I <br />
The URL can be used to link to this page
Your browser does not support the video tag.