Laserfiche WebLink
<br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The stabi 1 ity of the rai sed embankment dam was checked and found to meet <br />acceptable safety factor criteria. Abundant materials of suitable quality are <br />available from the required excavation of the auxiliary spillway channel to <br />raise the embankment. <br /> <br />The total estimated cost for enlarging Elkhead Lake Dam and Reservoir as <br />descrilJed is $1,338,845. This includes the cost of the feasibility study, <br />estimated constructi on cost, a constructi on conti ngency of 15 percent, the <br />cost of engineering and construction management, and allowances for escalation <br />and interest during construction. No land or water rights purchases are <br />expected to be necessary. The cost of any environmental evaluations, should <br />they be required, was not considered in the cost estimate, <br /> <br />After equitably determining the financial responsibility for the project <br />amongst the co-owners of the enlarged reservoir, it was determined that <br />$340,400 would be furnished by the CDOW and Colorado Ute. The $20,500 cost of <br />the feasi bil i ty study \~as sha red equally by the CWCS and CRWCD. The total <br />cost to the City, therefore, would be $977,945. <br /> <br />The uni t cost to the City for 2400 acre-feet of new storage at the enl arged <br />El khead Lake Reservoi r woul d be $407 per acre-foot, and the cost of 2300 <br />acre-foot of firm annual yield would be $425 per acre foot. This would result <br />in an initial annualized cost per acre-foot of yield of $38. After the <br />non-CWCS porti on of the debt is reti red and the Emergency Operati ng Fund is <br />established, the cost would be reduced to $13 per acre-foot annually. <br /> <br />This cost compares favorably with the most likely alternative source of <br />available water, which is storage at the new Stagecoach Reservoir, which would <br />cost the City approximately $85 per acre-foot annually. <br /> <br />The proj ect costs allocated to the Ci ty wi 11 be fi nanced through the CWCS <br />Construction Fund and the municipal bond market. The CWCS will need to loan <br />$494,222 to the Ci ty. The City will repay the loan over 40 years at a fi ve <br />percent annual interest rate. The remainder of the project costs, $488,973, <br />could be financed through the municipal bond market over a period of 15 years, <br />at an annual interest rate of seven percent, A pay-out schedule through the <br /> <br />E-6 <br />